Skip to main content
GSBiomass, or Liquid Biofuel - ElectricityMadagascarAMS-I.L

Rural electrification program Madagascar

GS-2312 ↗ · current registry ID: GS7623

This rating is archived — the project is no longer listed or its registry data has changed. This is the last published analysis (2026-08-01).
6.5/ 10
Integrity
6.8
Transparency
6.2
Claim Safety
5.8
Documentation
7.2

Audit Analysis

The project demonstrates solid foundational verification with additionality confirmed and smart-meter monitoring in place. However, significant contradictions between documents regarding crediting periods, leakage treatment, and emission reduction figures indicate evolving data quality that requires careful tracking. While administrative corrective actions are being addressed, the lack of CORSIA/CCP status disclosure and unverified baseline reassessment dates limit overall confidence.

Red Flags

  • Multiple contradictions between documents regarding crediting period dates, leakage justification, and verified emission reduction figures
  • CORSIA and CCP eligibility statuses are not stated, leaving dual-claiming risks unaddressed
  • Numerous material findings and corrective actions related to inconsistent SDG impact values and missing parameter evidence

Credit Vintages

IssuedRetiredAvailable
2021
1660166
2022
5810581
2023
35210342
Total1,099101,089

Risk Indicators

Additionality

VVB-confirmed

Permanence

Buffer pool absent

Leakage

Inconsistent justification history

Baseline

Project-specific, no reassessment date

Safeguards

Partial documentation

Double-claim

Status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-01AMS-I.L

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents