Skip to main content
GSavoidanceUgandaVintage 2023 Registry: Certified & creditingGeneral Methodologyv2.1

Safe Water Systems for Rural Uganda

GS-3746 ↗ · current registry ID: GS11861

#24of 108 in Water#18of 163 in Uganda#331of 1801 in Gold Standard (GS)

5.6/ 10
Integrity
5.5
Transparency
6.0
Claim Safety
5.5
Documentation
5.5

Audit Analysis

A Gold Standard water purification project in Uganda with VVB-verified additionality and a quantified 5% leakage deduction, but weakened by a project-specific baseline, absence of a buffer pool for an avoidance credit, and a substantial volume of resolved data-quality findings. The usage rate is assumed at 100% while field verification shows 94.2%, introducing a modest over-claim. CORSIA and CCP eligibility are not stated, leaving dual-channel risk unaddressed.

Red Flags

  • No buffer pool or permanence mechanism identified for an avoidance-type credit (water purification), leaving reversal risk unmitigated
  • Usage rate assumed at 100% in the PDD while the 2024 verification report records a verified rate of 94.2%, a 5.8% over-claim on a key parameter
  • Nineteen material findings and nine corrective actions in the 2024 verification report, including discrepancies in ER values, monitoring parameters, and GHG reduction figures between the monitoring report and the ER sheet
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel or double-claim risk unassessed

Credit Vintages

IssuedRetiredAvailable
2022
18,67718,6770
2023
34,81710,83923,978
2024
12,617012,617
Total66,11129,51636,595

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

5% quantified deduction

Baseline

Project-specific, no reassessment date

Safeguards

FPIC, grievance, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents