Skip to main content
UCRRajasthan IndiaAMS-I.F

Small Scale Solar Power Project in Reengus, Rajasthan

UCR-426 ↗

#477of 770 in Renewable energy#1of 8 in Rajasthan India#36of 421 in Universal Carbon Registry (UCR)#12of 26 in AMS-I.F

4.1/ 10
Integrity
4.0
Transparency
3.5
Claim Safety
5.5
Documentation
3.0

Audit Analysis

A small-scale solar power project in Rajasthan registered under the UCR standard with a 20-year crediting period and a lifetime claim of 1,576 tCO₂e. The project uses a jurisdictional baseline and a smart-meter monitoring approach, but the available record contains only the PDD — no verification report, monitoring report, or VVB identification was found, leaving additionality, permanence safeguards, and claim verification largely unconfirmed.

Red Flags

  • No VVB name or additionality test type found in the available documents, leaving the additionality claim unverified
  • No buffer pool percentage stated, leaving permanence risk unaddressed despite the 20-year crediting period
  • No verified ERR figure available to cross-check against the 1,576 tCO₂e lifetime claim
  • Grid emission factor sourced from 2013 data, which may overstate the displacement benefit as the Indian grid decarbonises

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

No test type or VVB verification found in available document

Permanence

No buffer pool stated; no reversal events but 20-year commit

Leakage

0% deduction, deemed negligible — appropriate for grid-displ

Baseline

Jurisdictional method used, but no reassessment date recorde

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status both unstated; dual-channel risk unass

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-20AMS-I.F

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents