2.7MW Captive Solar Power Project GARL, Gujarat.
#625of 770 in Renewable energy#4of 9 in Gujarat#247of 421 in Universal Carbon Registry (UCR)#24of 26 in AMS-I.F
Audit Analysis
A 2.7 MW captive solar project in Gujarat registered under the UCR standard, with a jurisdictional baseline and smart-meter monitoring, but critically lacking any verification or monitoring reports in the available record. Only the PDD (dated August 2023) is present, leaving additionality, leakage, permanence safeguards, and verified emission reductions entirely unconfirmed. The project's inherent low reversal risk as a solar avoidance project is a positive, but the documentation gap is substantial.
Red Flags
- No verification report, monitoring report, or VVB report found in the extracted record — only the PDD is available, leaving all post-registration claims unverified
- Additionality test type and VVB confirmation are not stated in any available document
- Leakage treatment (deduction or justification) is entirely absent from the record
- Crediting period (Nov 2020 – Dec 2022) has already ended, yet no monitoring or verification data is available to confirm actual delivery
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type and VVB confirmation not stated in available docum
Solar avoidance project — low inherent reversal risk
No deduction or justification documented in available record
Jurisdictional baseline stated; reassessment timing not docu
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status both not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →