2.5 MW Bundled Small Scale Solar Power Project in Arvalli, Gujarat.
#559of 770 in Renewable energy#151of 421 in Universal Carbon Registry (UCR)#20of 26 in AMS-I.F
Audit Analysis
A 2.5 MW bundled solar project in Gujarat registered under the UCR standard, at a very early PDD stage with only a single project document available. The project type (renewable energy) carries inherently low permanence and leakage risk, but the complete absence of documented additionality assessment, an identified verification body, and any verification or monitoring data represents a significant evidence gap. The claims appear conservative and internally consistent, but cannot yet be independently verified.
Red Flags
- No additionality test type or VVB verification of additionality is documented in the available PDD, leaving the core additionality claim unverified
- No verification body (VVB) is identified in the extracted record, making independent assurance of the project's claims impossible at this stage
- Only a single document (the PDD dated 2025-08-20) is available; no verification report, monitoring report, or VVB audit report exists in the record
- FPIC and grievance mechanism status are not stated in the available documents, leaving community safeguards unconfirmed
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type not documented; no VVB confirmation found
Solar generation project; no carbon stock reversal risk
0% deduction deemed negligible; consistent with project type
Jurisdictional baseline with 2024 grid EF; no reassessment d
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →