4.65 MW Bundled Wind Power Project of Kayaar Exports Private Limited
#728of 770 in Renewable energy#7of 7 in Tamil Nadu#405of 421 in Universal Carbon Registry (UCR)#26of 26 in AMS-I.F
Audit Analysis
This 4.65 MW wind project under the UCR registry has a project-specific baseline and a 0% leakage deduction deemed negligible, which is reasonable for wind. However, the evidence base is extremely thin: only a single PDD (dated June 2023) was available, with no verification report, no monitoring report, no identified verification body, and no stated additionality test. The 10-year gap between the crediting period start (2013) and the PDD date (2023) with no interim monitoring data is a significant concern.
Red Flags
- No verification body (VVB) is identified in any available document, making it impossible to confirm independent verification of additionality or emissions reductions.
- Only one document (the PDD) was available; no verification report, monitoring report, or VVB audit report was found despite a 12-year crediting period (2013–2024).
- Additionality test type is not stated and no VVB confirmation of additionality is recorded in the extracted data.
- The PDD is dated June 2023, yet the crediting period began in January 2013 — a 10-year gap with no documented interim monitoring or verification.
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No test type or VVB confirmation found
No buffer pool; reversal risk unquantified
0% deemed negligible – reasonable for wind
Project-specific; no reassessment date
Mentioned; FPIC and grievance not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →