UCR110200 Republic of Uzbekistan Tashkent Region Angren siti Gulbog МFY Industrial ZoneAMS-I.F

0.33 MW Bundled Solar Power Project by FE LLC «Birinchi rezinotexnika zavodi»

UCR-575 ↗

#479of 770 in Renewable energy#37of 421 in Universal Carbon Registry (UCR)#13of 26 in AMS-I.F

4.0/ 10
Integrity
4.5
Transparency
3.0
Claim Safety
5.0
Documentation
3.0

Audit Analysis

A small 0.33 MW solar PV project in Uzbekistan registered under the UCR with a jurisdictional baseline and a 20-year crediting period. The project type carries inherently low permanence risk, and the leakage treatment is reasonable for solar, but the available record consists solely of a PDD with no verification report, no monitoring data, and no identified VVB, leaving additionality and actual emissions reductions unconfirmed.

Red Flags

  • No verification report or monitoring report is present in the extracted record; additionality test type and VVB confirmation are not stated in any available document
  • No ERR figures (claimed or verified) are available, making it impossible to assess whether the project is delivering on its stated reductions
  • Only a single document (PDD) was used for extraction, and the VVB name is not stated, leaving the independence and rigour of the verification process unconfirmed

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type not stated; no VVB confirmation found

Permanence

Solar PV avoidance project; no reversal risk

Leakage

0% deemed negligible; consistent with solar PV

Baseline

Jurisdictional baseline; reassessment timing not stated

Safeguards

Safeguards mentioned; FPIC and grievance mechanism not detai

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.F.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents