Re-assessment pending
Solar Photovoltaic Project by Giriraj Renewables Private Limited
- Standard
- VCS
- Methodology
- ACM0002 (CDM)
- Registry
- VCS-1786 ↗ · Registered
- Country
- India
- Credit type
- Energy industries (renewable/non-renewable sources)
- Developer
- Avaada Energy Private Limited
Solar Photovoltaic Project by Giriraj Renewables Private Limited (VCS-1786) is being re-assessed under the current CarbonMeld methodology (v3): its earlier rating came from an older version of the method and is no longer shown, so this page gives no CarbonMeld rating until the new analysis is published.
Assessment
Being reassessed under the current method
The earlier analysis of this project used an older version of our method, so its rating is no longer shown: it is not comparable with ratings under the current method (v3). The new analysis will appear here once it is published; until then, this page shows the project's registry data.
Standard and methodology
Evidence
Eligibility & market
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
No CORSIA label on the registry
Not usable for airlines' CORSIA obligations.
Source: registry label · read on 12 Nov 2026
Covers: this project's credit records as read on the registry
Integrity label (ICVCM CCP)
Methodology not approved by ICVCMACM0002
The Integrity Council assessed this methodology as not meeting the Core Carbon Principles.
Source: ICVCM assessment · ICVCM table read on 4 Nov 2026
Covers: the methodology (every project using it), not this project's credits
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: project sector
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
No Article 6 authorization
No corresponding adjustment: the host country can also count this reduction towards its own target.
Source: registry label · read on 12 Nov 2026
Covers: this project's credit records as read on the registry
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 174,210 | 174,210 | 0 | |
| 2019 | 273,304 | 237,581 | 35,723 | |
| 2020 | 278,725 | 211,152 | 67,573 | |
| 2021 | 275,895 | 201,047 | 74,848 | |
| 2022 | 277,289 | 0 | 277,289 | |
| 2023 | 82,274 | 0 | 82,274 | |
| Total | 1,361,697 | 823,990 | 537,707 |
Methodology versions used
The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.
2019–2020ACM0002 v19.0since replaced by v22.0
monitoring report
official page · verified on
2020ACM0002 v19.0since replaced by v22.0
monitoring report + verification report
official page · verified on
2021ACM0002 v19.0since replaced by v22.0
verification report
official page · verified on
2021–2023ACM0002 v19.0since replaced by v22.0
monitoring report + verification report
official page · verified on
- ACM0002: Active (CDM / UNFCCC) · official page · verified on
A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.
Retired by
- British Airways120,846 t
- Etsy, Inc70,000 t
- MKS PAMP SA26,625 t
- Yamato Transport Co., Ltd13,064 t
- U.S. Venture, Inc3,940 t
- Corona Energy2,267 t
- Yusen Logistics Co.,Ltd2,000 t
- Gas Aggregator Company Nigeria ltd/gte (GACN)1,726 t
- Furrows Limited1,390 t
- TRANSCONTAINER LIMITED800 t
Organisations named as beneficiaries in the registry's public retirement records.
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at listings@carbonmeld.com.
Profile & governance
Are you the project owner?
Full analysis (free for owners)
Owners get free access to the full analysis of their own project: every rule that raised or lowered the number, with the fact and the source it rests on, the negative facts' detail and the documents read. Write to us from your organisation's email address.
hello@carbonmeld.com →Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the rating.
hello@carbonmeld.com →Report an error on this page
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Report an error on this page →Cite this page
CarbonMeld (2026). Solar Photovoltaic Project by Giriraj Renewables Private Limited (VCS-1786): registry data. https://carbonmeld.com/projects/solar-photovoltaic-project-by-giriraj-renewables-private-limited-vcs-1786/.
The citation names the registry data this page shows; the page gives no CarbonMeld rating.
Records with the same name in other registries
Records in another registry with the same name, country and methodology. Each has its own credits, documents and rating.
- SOLAR PHOTOVOLTAIC PROJECT BY GIRIRAJ RENEWABLES PRIVATE LIMITEDGold Standard · GS-3208
Similar projects
Same methodology or sector, the same registry first.
- Inner Mongolia Baotou Bayin Wind Power ProjectVCS-355
- Hebei Kangbao Wolongtushan 30 MW Wind Farm ProjectVCS-148
- VTRM RENEWABLE ENERGY 2 - CORSIA EligibleVCS-1903
- Xinjiang Dabancheng Sanchang Phase III Wind Power ProjectVCS-470
- De Aar Hydra StorageVCS-5337
- Folha Larga Sul Renewable EnergyVCS-1995
- Guohua Tongliao Kezuo Zhongqi Phase I 49.5 MW Wind Farm ProjectVCS-1310
- Jiangsu Qidong Dongyuan Wind Power ProjectVCS-421
