Suzlon 8.40 MW Wind Power Project
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB using an investment test in the verification report.
missing Leakage is not addressed in the latest verification record, and the report also lists several corrective actions affecting monitoring reliability.
Transparency
verified The project has a named VVB, a defined monitoring period, and matching claimed and verified emissions reductions in the latest verification report.
missing The extraction confidence is low and the verification report notes unclear monitoring dates, missing turbine breakdown details, and incomplete calibration coverage.
Claim Safety
verified The project is an avoidance project in the renewable energy sector, and the latest verification report shows claimed and verified reductions both at 13,797 tCO2e.
missing Leakage treatment is not addressed in the latest record, and earlier documents conflict on both the credited volume and the crediting period.
Documentation
verified Twenty-five documents were used, and the latest verification report is recent, dated 2024-03-19.
missing Minimum extraction confidence is low, and the report includes several corrective actions plus missing or unclear monitoring information.
Detailed Analysis
Integrity
The verification report confirms additionality through an investment test and names RINA Services S.p.A. as the VVB, which supports the project’s core environmental case. No material findings were reported, but the report still lists multiple corrective actions, including unclear monitoring dates, missing installed-technology details, and incomplete meter calibration coverage, which weakens confidence in the MRV basis. Leakage is not addressed in the latest record, so I treat that as a meaningful weakness for integrity.
Transparency
Transparency is mixed: the project has a defined monitoring period from 2021-09-01 to 2023-04-30 and the latest verification report shows claimed and verified reductions both at 13,797 tCO2e. However, the extraction confidence is low, the evidence set includes only an unspecified document list, and the report itself flags unclear monitoring dates and missing section 3.1 details. Those gaps reduce the clarity and auditability of the public record.
Claim Safety
Claim safety is moderate because this is a wind avoidance project under VCS, and the latest verification report shows no gap between claimed and verified emissions reductions. That said, the project is not CORSIA-eligible, CCP status is not stated, and leakage is not addressed in the latest verification record. Earlier documents also conflict on the credited amount and crediting period, which raises over-crediting and reliability concerns.
Documentation
Documentation breadth is decent, with 25 documents used and a recent verification report dated 2024-03-19. Even so, the extraction confidence is low, and the report contains several corrective actions and missing details on installed equipment, calibration coverage, and monitoring-period clarity. The record is therefore incomplete enough to materially reduce the documentation score.
Overall
I privileged the latest verification report for the verified emissions reduction figure of 13,797 tCO2e and the current monitoring period because it is the most recent and project-specific source. I also privileged the latest report’s statement that leakage is not addressed, even though an earlier document reportedly treated leakage as negligible; that inconsistency lowers reliability and is explicitly reflected in the score. Likewise, I treated the newer crediting period of 2020-12-31 to 2030-12-30 as controlling over the older period, but the contradiction itself remains a red flag and reduces confidence.
Audit Analysis
This is a registered VCS wind project with VVB-confirmed additionality and no reported material findings, which supports moderate integrity. However, documentation quality is weak, several corrective actions were raised, and key MRV items such as leakage treatment and monitoring details are incomplete or inconsistent.
Project Description
Kishangarh Hi-tech Textile Park Ltd. partnered with Suzlon Energy Limited to construct an 8.4 MW wind power project. The energy generated will be utilized at their state-of-the-art integrated textile park in Rajasthan. This project was registered with the UNFCCC in 2012.
Red Flags
- The verification report lists multiple corrective actions, including unclear monitoring dates, missing installed-technology details, and meter calibration gaps.
- There are material contradictions across documents on credited emissions reductions, crediting period, and leakage treatment, which reduces reliability.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 13,361 | 13,361 | 0 | |
| 2012 | 12,834 | 12,834 | 0 | |
| 2013 | 8,495 | 8,495 | 0 | |
| 2014 | 10,630 | 10,630 | 0 | |
| 2015 | 11,134 | 11,134 | 0 | |
| 2016 | 9,095 | 9,095 | 0 | |
| 2017 | 11,290 | 11,290 | 0 | |
| 2018 | 8,677 | 3,307 | 5,370 | |
| 2020 | 9,053 | 9,053 | 0 | |
| Total | 94,569 | 89,199 | 5,370 |
Cosa migliorerebbe questo punteggio
- Provide a complete, internally consistent monitoring package with clear dates, turbine/equipment breakdowns, and full meter calibration evidence.
- Resolve the document contradictions on credited volume, crediting period, and leakage treatment with a reconciled, signed audit trail.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
Leakage not addressed in latest report
Project baseline, reassessment not stated
FPIC, grievance, and safeguards noted
Not CORSIA-eligible; CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →