TIST Program in Uganda, VCS 005
#98of 261 in Soil carbon#68of 163 in Uganda#747of 1339 in Verra (VCS)
Audit Analysis
The TIST Program in Uganda (VCS-005) is a registered afforestation project with confirmed additionality and a 10% buffer pool, but it carries an unusually high volume of material findings (33 NCRs/CLs) spanning duplicate registrations, boundary errors, harvest violations, and non-standardized monitoring procedures. While all identified issues were addressed through corrective actions, the sheer number of deficiencies and the project-specific baseline with a 0% leakage deduction leave meaningful residual risk. The project delivered approximately 260% of the linear pro-rata expectation for the monitoring period, which is plausible for a maturing TIST but warrants scrutiny.
Red Flags
- 33 Non-conformance Reports and Clarifications identified across verification cycles, including duplicate registrations of 69 Project Areas, boundary/polygon errors in multiple groves, and use of monitoring data from areas external to the project boundary
- Harvest activity affecting 5–6% of carbon stocks in violation of project contracts, with 50–52 Project Areas removed from the program
- Contradiction between the main verification report (no reversal events) and the appendix (reversal events reported), with material findings confirming 3 PAs lost to fire
- Non-standardized tree counting and DBH measurement procedures, with inconsistencies in tree counts between onsite observation, reference sheets, and Excel records
- 105 Project Areas removed from the project design since the second verification, requiring zeroing of previously issued credits
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2003 | 50,696 | 50,696 | 0 | |
| 2012 | 464,116 | 464,062 | 54 | |
| 2017 | 111,073 | 108,478 | 2,595 | |
| Total | 625,885 | 623,236 | 2,649 |
Risk Indicators
VVB-confirmed investment test
10% buffer, minor fire losses, harvest violations
0% deduction, quantified justification
Project-specific, reassessment timing not stated
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →