Vai al contenuto principale
VCS Energy industries (renewable/non-renewable sources) Turkey Registry: Registered Documentazione completa General Methodology v2.0

Urla Wind Power Project, Turkey

VCS-1439 ↗

4.7 / 10
Integrity
5.2
Transparency
4.6
Claim Safety
4.8
Documentation
3.7

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using an investment test, which supports the core baseline case.

missing The verification report records material findings and numerous corrective actions, including concerns about additionality sensitivity, project description consistency, and emissions calculation support.

Transparency

verified The monitoring period is stated and the verified emissions reductions equal the claimed amount, which helps traceability.

missing The file has low extraction confidence and only one evidence document is clearly identified, with many corrective actions suggesting incomplete or inconsistent reporting.

Claim Safety

verified The project is a wind power activity under ACM 0002 with a quantified leakage deduction of 0%, which is generally favorable for over-crediting risk.

missing The project is marked CORSIA-eligible, while CCP status is not mentioned, so dual-channel claim risk is not fully excluded.

Documentation

verified The record includes a recent verification report dated 2024-10-21, a named VVB, and a defined monitoring period.

missing Extraction confidence is low, the evidence-doc list is sparse, and the report contains many unresolved corrective actions and at least one unresolved non-permanence statement.

Detailed Analysis

Integrity

The verification report confirms additionality through an investment test and the project uses ACM 0002 with a project baseline, which is supportive. Leakage is stated as quantified with a 0% deduction, but the report also includes material findings and many corrective actions, including a request to justify the impact of higher energy yield on additionality. Reversal risk is not well developed in the extracted record; the report says there is no non-permanence risk rating determined by the project proponent, and buffer pool coverage is not found.

Transparency

The monitoring period is clearly stated as 2021-03-01 to 2024-02-29, and total claimed and verified reductions both equal 122,851, which is a positive sign for traceability. However, the extraction confidence is low and only one evidence document is clearly listed, so the documentation trail appears thin. Several corrective actions also indicate that key reporting elements needed clarification or correction.

Claim Safety

Claim safety is helped by the wind project type, the quantified zero leakage deduction, and the fact that claimed and verified reductions match exactly. At the same time, the project is marked CORSIA-eligible and CCP status is not mentioned, so the record does not rule out dual-market claim concerns. The contradiction on leakage treatment also weakens confidence, even though the later verification report appears to privilege a quantified approach.

Documentation

The file includes a recent verification report, a named VVB, and a defined crediting period, which are positive documentation signals. But the extraction confidence is low, the evidence list is sparse, and the report contains a long list of corrective actions, suggesting the documentation package is not fully clean. The absence of a clearly stated buffer pool and the lack of a reassessed baseline date further limit documentation quality.

Overall

I privileged the 2024-10-21 verification report over older conflicting entries because it is the most recent and appears to be the higher-priority assurance document. On contradictions, I treated leakage as quantified because the later report is more specific, additionality as an investment test because the later report is more current, and benefit sharing as not described because the later report explicitly says so. These contradictions, together with low extraction confidence and numerous corrective actions, justify a downward adjustment in confidence and overall score.

Audit Analysis

The project has some strengths: additionality was confirmed by the VVB, leakage was quantified at 0%, and the monitoring period shows verified emissions reductions matching the claimed amount. However, the verification report contains many corrective actions and material findings, and the record has several contradictions that reduce confidence in the documentation and claim safety. Overall, this looks like a moderately credible wind project, but the evidence quality is uneven and the file is not clean enough for a high-confidence assessment.

Project Description

Proponent: Egenda Ege Enerji Uretim A.S Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: ACM0002 Estimated annual GHG reductions: 26680 tCO2e Region: Middle East Registration date: 2020-04-06

Red Flags

  • The verification report lists multiple material findings and a long set of corrective actions, including issues with project description consistency, stakeholder handling, and emissions calculation support.
  • There are contradictions across documents on the additionality test type, leakage treatment, and benefit-sharing description, which weakens reliability.

Credit Vintages

Issued Retired Available
2016
15,805 15,805 0
2017
25,070 25,070 0
2018
24,997 24,409 588
2019
24,464 24,464 0
2020
26,922 26,922 0
2021
29,210 5,593 23,617
2022
28,850 0 28,850
2023
24,977 0 24,977
2024
5,596 0 5,596
Total 205,891 122,263 83,628

Cosa migliorerebbe questo punteggio

  • Provide a clean, reconciled document set that resolves the contradictions on additionality, leakage, and benefit sharing.
  • Add explicit evidence on buffer pool coverage, reversal risk treatment, and registry/claim status to strengthen permanence and double-claim assessment.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No buffer pool stated

Leakage

Quantified 0% leakage deduction

Baseline

Project baseline, reassessment not stated

Safeguards

FPIC and grievance present, but incomplete detail

Double-claim

CORSIA-eligible; CCP status not mentioned

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti