The Urla Wind Power Project is a VCS-registered wind avoidance project with VVB-confirmed additionality and matching claimed/verified ERRs, but is undermined by 26 corrective actions, material findings questioning stakeholder identification and personnel overlap with a sister project, a project-specific baseline, and a grid emission factor frozen at 2011 values. The low extraction confidence and multiple inter-document contradictions further erode confidence in the data record.

Red Flags

  • 26 corrective actions required in the 2024 verification report, including inconsistencies in data/parameters, project name errors, and missing generation licence documentation
  • Material finding: the same three individuals serve as Plant Manager, Plant Chief, and Electricity Trading Manager across two separate power plants (projects 1438 and 1439), raising questions about organisational independence and the validity of stakeholder interviews
  • Grid emission factor of 0.5833 tCO2/MWh is from 2011 and has not been updated, potentially overestimating reductions if Turkey's grid has decarbonised
  • No buffer pool percentage stated and reversal events explicitly 'not addressed' in the verification report, despite the project being within its crediting period
  • Low extraction confidence across the document set, indicating at least one key document was poorly readable or incomplete

Credit Vintages

IssuedRetiredAvailable
2016
15,80515,8050
2017
25,07025,0700
2018
24,99724,409588
2019
24,46424,4640
2020
26,92226,9220
2021
29,2105,59323,617
2022
28,850028,850
2023
24,977024,977
2024
5,59605,596
Total205,891122,26383,628

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

reversals not addressed

Leakage

0% deduction, quantified justification

Baseline

Project-specific; reassessment timing not stated

Safeguards

FPIC and grievance present; 26 CARs on stakeholder docs

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM 0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents