Vaspet-II and Vaspet-III Wind Power Project, Maharashtra
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB using an investment test, which supports the project’s core eligibility case.
missing The verification report lists several findings and corrective actions, including a calibration gap and unresolved proof-of-right concerns, which weaken confidence in the emissions claim.
Transparency
verified The monitoring period and recent baseline reassessment are stated, and the project has a named VVB and a quantified verified issuance figure in the latest record.
missing The extracted record shows missing and inconsistent information in the project description, monitoring report, and verification report, with low extraction confidence and only one evidence document identified.
Claim Safety
verified The project uses ACM0002 with a project baseline and reports a leakage deduction of 0%, which is at least explicitly stated.
missing Claim safety is reduced by the contradiction in verified emission reductions and by the fact that leakage justification is described as not addressed in the latest record.
Documentation
verified The record includes many extracted facts, a recent issuance document, and a named VVB, which helps basic traceability.
missing Low extraction confidence, multiple corrective actions, and missing or incomplete sections in the underlying reports indicate weak documentation quality.
Detailed Analysis
Integrity
The project’s additionality is stronger than average because the verification report confirms an investment test and VVB validation. On the other hand, the issuance record lists multiple findings, including a meter calibration gap and unresolved questions about proof of right for the emission reductions, which lowers confidence in the integrity of the claim. The project is a wind power activity, so reversal risk is inherently low, but the record does not provide a buffer pool percentage and says reversal events are not addressed.
Transparency
Transparency is mixed: the record identifies the VVB, monitoring period, methodology version, and a recent issuance date, and it reports 36,878 verified emission reductions. However, the extracted material also says there is missing and inconsistent information in the project description, monitoring report, and verification report, and the extraction confidence is low. That combination materially weakens the transparency score.
Claim Safety
Claim safety is limited by the contradiction in verified emission reductions, where the latest record shows 36,878 but an earlier document shows 477,443. I privileged the more recent issuance record because it is later and appears to be the authoritative verification outcome, but the discrepancy still signals reliability risk. Leakage is stated as 0%, yet the justification is marked as not addressed in the latest record, so the zero deduction is not fully reassuring.
Documentation
The documentation set is broad enough to extract many project facts, but the evidence quality is uneven. The record explicitly says several sections were missing or inconsistent, and the extraction confidence is low, which suggests at least one key document was hard to read. I also note the open corrective actions and the unresolved proof-of-right question, both of which indicate incomplete documentation control.
Overall
I privileged the most recent issuance record for the verified emissions figure, leakage treatment, and crediting-period information because it is later than the conflicting earlier records and appears to reflect the final verification state. Even so, the contradictions are material: leakage justification shifts from quantified to not addressed, benefit-sharing documentation changes, verified emissions differ sharply, and the crediting period changes from 2013–2023 to 2023–2033. These discrepancies, together with low extraction confidence and multiple open findings, justify a conservative overall score.
Audit Analysis
This wind project has some strengths, including VVB-confirmed additionality, a recent baseline reassessment, and a quantified leakage deduction of 0%. However, the record contains multiple material inconsistencies and open verification issues, including missing or inconsistent monitoring information, unresolved proof-of-right concerns, and a low extraction-confidence record. Overall, the project looks procedurally active but not especially robust from a documentation and claim-safety perspective.
Project Description
Proponent: ReNew Wind Energy (Shivpur) Private Limited Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: ACM0002 Estimated annual GHG reductions: 85105 tCO2e Region: Asia Registration date: 2020-04-06
Red Flags
- The verification package reports multiple missing and inconsistent sections, plus open or recently raised findings on monitoring, calibration, and proof of right.
- There is a major contradiction in reported emission reductions, with one document showing 36,878 verified and an earlier one showing 477,443, which weakens reliability.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 46,851 | 46,851 | 0 | |
| 2014 | 82,588 | 79,647 | 2,941 | |
| 2015 | 92,363 | 92,363 | 0 | |
| 2016 | 96,931 | 57,035 | 39,896 | |
| 2017 | 84,879 | 33,358 | 51,521 | |
| 2018 | 88,140 | 37,903 | 50,237 | |
| 2019 | 149,377 | 149,377 | 0 | |
| 2020 | 83,993 | 83,993 | 0 | |
| 2021 | 79,313 | 57,565 | 21,748 | |
| 2022 | 79,328 | 73,005 | 6,323 | |
| 2023 | 10,999 | 3,146 | 7,853 | |
| Total | 894,762 | 714,243 | 180,519 |
Cosa migliorerebbe questo punteggio
- Publish a clean, reconciled monitoring and verification package that resolves the emission-reduction, crediting-period, and leakage contradictions.
- Provide complete proof-of-right documentation, meter calibration evidence, and a fully traceable grievance and safeguards record.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
Wind project; no reversal events applicable
0% deduction but justification not addressed
Project baseline with recent reassessment
FPIC and grievance mechanism present, but documentation inco
CORSIA-eligible; CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →