Skip to main content
UCRChhattisgarh IndiaACM0012

Waste Heat Recovery based captive power generation by SKS Ispat Ltd

UCR-574 ↗

#189of 202 in Industrial#292of 421 in Universal Carbon Registry (UCR)#14of 15 in ACM0012

3.1/ 10
Integrity
4.0
Transparency
1.5
Claim Safety
4.0
Documentation
2.5

Audit Analysis

This waste heat recovery project under the UCR standard presents a fundamentally sound concept—capturing otherwise-lost industrial heat for power generation—but the available documentation is extremely limited, consisting solely of a PDD with no verification report, monitoring report, or VVB assessment. The complete absence of documented additionality testing, verified emissions reductions, and a named verification body creates significant uncertainty about the robustness of the 515,672 tCO2e claim.

Red Flags

  • No additionality test type or VVB verification of additionality found in any available document
  • No verification body (VVB) identified in the extracted record
  • No verified ERR figure available to corroborate the 515,672 tCO2e claimed total
  • Only a single document (PDD) was used for extraction; no verification or monitoring reports available
  • Leakage deduction of 0% justified only as 'deemed negligible' with no quantitative analysis

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

No additionality test documented

Permanence

No buffer pool; low inherent reversal risk

Leakage

0% deduction, qualitative justification only

Baseline

Project-specific, no reassessment date

Safeguards

Mentioned but FPIC and grievance mechanism not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-20ACM0012

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents