7.1 MW Captive Power Plant At M/S Prakash Sponge Iron & Private Ltd. (PSIPL)
#220of 421 in Universal Carbon Registry (UCR)#12of 15 in ACM0012
Audit Analysis
This 7.1 MW captive power plant project under the UCR registry presents a methodologically plausible design (ACM0012 v6.0, reasonable Indian grid emission factor of 0.9096 tCO₂/MWh) but suffers from a critical evidence gap: only the Project Design Document is available, with no verification report, monitoring report, or identified verification body. Additionality verification, baseline reassessment, and permanence safeguards (buffer pool) are all unconfirmed, leaving the project's integrity claims largely unvalidated.
Red Flags
- No verification body (VVB) is identified in any available document, and additionality verification status is entirely unconfirmed
- Only a single document (the PDD) is available; no verification report, monitoring report, or VVB audit trail exists in the extracted record
- Project-specific baseline over a 25-year crediting period with no stated reassessment schedule or date
- No buffer pool or permanence risk mitigation mechanism is documented for a 25-year crediting period
- FPIC and grievance mechanism status are not stated in available documents
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type and VVB verification not stated
No buffer pool; no reversal events reported
0% deemed negligible; reasonable for captive power
Project-specific; no reassessment date over 25-yr period
Mentioned; FPIC and grievance mechanism not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →