Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

Water for Climate Rwanda Project

GS-1531 ↗ · current registry ID: GS6598

#947of 1329 in Industrial#83of 139 in Rwanda#1374of 1801 in Gold Standard (GS)

4.5/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

The Water for Climate Rwanda Project is a Gold Standard domestic energy-efficiency project with a VVB-confirmed additionality assessment, but it relies on the weakest 'deemed additional' test, leaves reversal events unaddressed in the latest verification, and shifted its leakage treatment from quantified to deemed negligible. Multiple contradictions across documents—including monitoring method, FNRB value, and CCP eligibility—combined with low extraction confidence and four outstanding corrective actions, indicate meaningful data-reliability concerns that temper confidence in the claimed reductions.

Red Flags

  • Reversal events are explicitly 'not addressed' in the 2025 verification report, and no buffer pool percentage is stated in any available document.
  • Eleven contradictions across documents, including a shift in leakage justification from 'quantified' (2024 verification) to 'deemed negligible' (2025 verification) and a shift in FNRB method from 'local field' (PDD) to 'national default' (2025 verification).
  • CCP status is contradictory: the 2019 validation report lists the project as 'eligible' while the 2024 validation report does not mention CCP, creating unresolved dual-channel risk.
  • Four outstanding Findings and Action Requests (FARs) relate to QA/QC of data registration, user registration at water points, and preventive/corrective maintenance—none yet closed.
  • Minimum extraction confidence is rated 'low', indicating at least one key document was poorly readable, reducing reliability of the extracted record.

Credit Vintages

IssuedRetiredAvailable
2019
11,03411,0340
2020
23,62623,6260
2021
26,5507,66518,885
2022
56,311056,311
2023
79,141079,141
2024
13,492013,492
Total210,15442,325167,829

Risk Indicators

Additionality

Deemed additional – weakest test, VVB-confirmed

Permanence

Reversals not addressed

Leakage

0 % deduction, deemed negligible; shifted from quantified

Baseline

Project-specific baseline, reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit-sharing documented

Double-claim

CCP status contradictory; CORSIA not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents