Water for Climate Rwanda Project
GS-1531 ↗ · current registry ID: GS6598
#947of 1329 in Industrial#83of 139 in Rwanda#1374of 1801 in Gold Standard (GS)
Audit Analysis
The Water for Climate Rwanda Project is a Gold Standard domestic energy-efficiency project with a VVB-confirmed additionality assessment, but it relies on the weakest 'deemed additional' test, leaves reversal events unaddressed in the latest verification, and shifted its leakage treatment from quantified to deemed negligible. Multiple contradictions across documents—including monitoring method, FNRB value, and CCP eligibility—combined with low extraction confidence and four outstanding corrective actions, indicate meaningful data-reliability concerns that temper confidence in the claimed reductions.
Red Flags
- Reversal events are explicitly 'not addressed' in the 2025 verification report, and no buffer pool percentage is stated in any available document.
- Eleven contradictions across documents, including a shift in leakage justification from 'quantified' (2024 verification) to 'deemed negligible' (2025 verification) and a shift in FNRB method from 'local field' (PDD) to 'national default' (2025 verification).
- CCP status is contradictory: the 2019 validation report lists the project as 'eligible' while the 2024 validation report does not mention CCP, creating unresolved dual-channel risk.
- Four outstanding Findings and Action Requests (FARs) relate to QA/QC of data registration, user registration at water points, and preventive/corrective maintenance—none yet closed.
- Minimum extraction confidence is rated 'low', indicating at least one key document was poorly readable, reducing reliability of the extracted record.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 11,034 | 11,034 | 0 | |
| 2020 | 23,626 | 23,626 | 0 | |
| 2021 | 26,550 | 7,665 | 18,885 | |
| 2022 | 56,311 | 0 | 56,311 | |
| 2023 | 79,141 | 0 | 79,141 | |
| 2024 | 13,492 | 0 | 13,492 | |
| Total | 210,154 | 42,325 | 167,829 |
Risk Indicators
Deemed additional – weakest test, VVB-confirmed
Reversals not addressed
0 % deduction, deemed negligible; shifted from quantified
Project-specific baseline, reassessed 2024
FPIC, grievance mechanism, benefit-sharing documented
CCP status contradictory; CORSIA not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →