Rated
Wind Energy Project at Jaisalmer district, Rajasthan by Enn Enn Corp Limited
- Standard
- GS
- Methodology
- AMS-I.D (CDM)
- Registry
- GS-2531 ↗ · current registry ID: GS7686 · Registered
- Country
- India
- Credit type
- Wind
- Developer
- EKI Energy Services Limited
CarbonMeld's document-based rating gives Wind Energy Project at Jaisalmer district, Rajasthan by Enn Enn Corp Limited (GS-2531) 3.2 out of 10 (Very low rating) under CarbonMeld methodology v3, documents read on 24 Oct 2026. The analysis read 11 of the 11 registry documents. It is CarbonMeld's own assessment, not a rating given by the registry or the standard.
Assessment
Evidence
Eligibility & market
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
No CORSIA label on the registry
Not usable for airlines' CORSIA obligations.
Source: registry label · read on 12 Nov 2026
Covers: this project's credit records as read on the registry
Integrity label (ICVCM CCP)
Methodology not approved by ICVCMAMS-I.D
The Integrity Council assessed this methodology as not meeting the Core Carbon Principles.
Source: ICVCM assessment · ICVCM table read on 4 Nov 2026
Covers: the methodology (every project using it), not this project's credits
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: registry label · read on 12 Nov 2026
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
Not published
This registry does not publish Article 6 authorizations.
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 1,321 | 0 | 1,321 | |
| 2020 | 6,603 | 0 | 6,603 | |
| Total | 7,924 | 0 | 7,924 |
Methodology versions used
The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.
2019–2020ACM0002 v19.0since replaced by v22.0
monitoring report
official page · verified on
2019–2020AMS-I.D v18.0current version
monitoring report + verification report
official page · verified on
- ACM0002: Active (CDM / UNFCCC) · official page · verified on
- AMS-I.D: Active (CDM / UNFCCC) · official page · verified on
A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at listings@carbonmeld.com.
Profile & governance
Are you the project owner?
Full analysis (free for owners)
Owners get free access to the full analysis of their own project: every rule that raised or lowered the number, with the fact and the source it rests on, the negative facts' detail and the documents read. Write to us from your organisation's email address.
hello@carbonmeld.com →Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the rating.
hello@carbonmeld.com →Contest this rating
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Contest this rating →Cite this page
CarbonMeld (2026). Wind Energy Project at Jaisalmer district, Rajasthan by Enn Enn Corp Limited (GS-2531): CarbonMeld document-based rating, methodology v3, documents read on 24 Oct 2026. https://carbonmeld.com/projects/wind-energy-project-at-jaisalmer-district-rajasthan-by-enn-enn-corp-limited-gs-2531/.
The citation names the rating by its methodology version and the day the documents were read.
Records with the same name in other registries
Records in another registry with the same name, country and methodology. Each has its own credits, documents and rating.
- Wind Energy Project at Jaisalmer district, Rajasthan by Enn Enn Corp LimitedClean Development Mechanism · CDM-8347
Similar projects
Same methodology or sector, the same registry first.
- Wind Energy Project in Gujarat by Enn Enn Corp LimitedGS-2600
- Everbright Zhenjiang Bundled Solar PV Power Generation Project_preCDM VERGS-1315
- 15 MW Solar Photovoltaic Power Project at GujaratGS-1369
- Nam Ngan Hydropower projectGS-516
- Xenamnoy 6 Hydropower ProjectGS-385
- 9 MW Wind Energy Farm at Jodhpur Rajasthan by HZLGS-1742
- Implementation and operation of Food & Energy Systems in MadagascarGS-2821
- 10MW Solar Power Project (EnvironmentFirst-213)GS-1980
