Wind Power Project by Rajasthan Gum Private Limited (EKIESL-CDM.September-12-02)
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB through an investment test in the verification report.
missing Reversal risk is not properly addressed: the record says reversal events are not addressed and no buffer pool percentage is stated.
Transparency
verified The verification report from Bureau Veritas (India) Pvt. Ltd. and the monitoring period are identified, and claimed versus verified ERs match at 119,956.
missing The extraction confidence is low, and the validation report lists several inconsistencies and missing items, including stakeholder communication assessment and technical details.
Claim Safety
verified The project reports a zero leakage deduction with leakage described as negligible.
missing The project is marked CORSIA-eligible, while the contradiction log shows leakage and benefit-sharing inconsistencies and a crediting-period mismatch across documents.
Documentation
verified A substantial set of official documents was used, with 21 extracted facts and a named VVB.
missing Low extraction confidence and multiple corrective actions indicate the record is incomplete and not fully reliable.
Detailed Analysis
Integrity
The verification report confirms additionality through an investment test, which supports the project’s core eligibility case. However, permanence is weakly documented because reversal events are not addressed and no buffer pool share is stated, even though this is a wind project with no explicit reversal-free treatment in the extracted record. The validation report also records several findings and corrective actions, including a monitoring-period correction and unresolved reporting issues, which reduce confidence in the robustness of the crediting case.
Transparency
The project has identifiable documentation, including a named VVB and a monitoring period, and the claimed and verified emission reductions are identical at 119,956. Still, the extraction confidence is low, which means at least one key source was hard to read, and the validation report contains multiple inconsistencies and missing assessments. The record also lacks several monitoring specifics, such as the usage monitoring method and verified usage rate, which limits public traceability.
Claim Safety
Claim safety is moderate at best because the project uses a project baseline and reports a zero leakage deduction, but the justification is only that leakage is deemed negligible. The project is marked CORSIA-eligible, which increases the need for careful scrutiny, and the contradiction log shows a leakage-justification mismatch between documents as well as a benefit-sharing inconsistency. The validation report also notes a double-counting concern because the project is registered under CDM and no undertaking for double counting was provided.
Documentation
The record includes many extracted facts and a named verification body, which is a positive sign for documentation coverage. However, the extraction confidence is low, and the validation report lists numerous corrective actions and findings, including inconsistent dates, audit-mode inconsistency, and missing grievance and technical details. The crediting-period contradiction also suggests the document set is not fully harmonized, which lowers documentation quality.
Overall
Overall, this is a mid-quality record with some strong points, especially VVB-confirmed additionality and matching claimed versus verified reductions, but it is held back by low extraction confidence and multiple document inconsistencies. I privileged the later validation report dated 2023-05-30 over earlier material where conflicts existed, because it is the more recent and more specific assessment; that is why the crediting-period and leakage-related contradictions were treated conservatively. The double-registration concern with CDM and the lack of a clear reversal treatment are the main reasons the score remains cautious.
Audit Analysis
The project has some positive integrity signals, including VVB-confirmed additionality and a stated zero leakage deduction, but the documentation also shows multiple verification findings and unresolved reversal treatment. Transparency is weakened by a low extraction-confidence record, missing monitoring details, and several document inconsistencies, so the credit claim should be treated cautiously.
Project Description
Proponent: Rajasthan Gum Private Limited Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: AMS-I.D. Estimated annual GHG reductions: 24213 tCO2e Region: Asia Registration date: 2020-04-06
Red Flags
- The verification report records multiple findings, including a six-year monitoring-period issue, inconsistent audit statements, and missing stakeholder-communication assessment.
- The project is also registered under CDM, and the verification report notes no undertaking for double counting, which raises dual-claim risk.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 751 | 751 | 0 | |
| 2013 | 21,599 | 21,599 | 0 | |
| 2014 | 23,054 | 23,054 | 0 | |
| 2015 | 129 | 129 | 0 | |
| Total | 45,533 | 45,533 | 0 |
Cosa migliorerebbe questo punteggio
- Provide a clean, reconciled document set that resolves the leakage, benefit-sharing, and crediting-period contradictions and clearly explains which version is authoritative.
- Add explicit reversal treatment, buffer-pool information, and a complete double-claim statement covering CDM registration and any other registry or program interactions.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
No buffer pool stated
Negligible leakage, but justification conflict
Project baseline, reassessment timing unclear
FPIC and grievance present, but incomplete assessment
CORSIA-eligible; no CCP status stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →