Wind Power Project in Tamil Nadu by Green Infra Renewable Energy Limited
#1138of 1935 in Renewable energy#584of 975 in India#758of 1339 in Verra (VCS)#889of 1287 in ACM0002
Audit Analysis
A large-scale wind power project in Tamil Nadu with a solid jurisdictional baseline and VVB-verified additionality, but undermined by an extensive list of material findings (30+ items), a 28% discrepancy between claimed and verified emission reductions, multiple cross-document contradictions, and low extraction confidence. The fundamental methodology (ACM0002) is well-established and the project type carries minimal permanence risk, yet the data quality and documentation gaps significantly erode confidence in the reported figures.
Red Flags
- Verified ERR (296,965 tCO2e) is 28% higher than the project's own claimed ERR (231,266 tCO2e) for the same monitoring period, indicating a material data inconsistency between the monitoring report and verification report
- FPIC status is directly contradicted: the verification report (June 2025) states FPIC was not conducted, while the monitoring report (January 2024) states it was conducted
- Over 30 material findings and 30+ corrective actions logged across verification and monitoring reports, including repeated meter calibration delays, inconsistent commissioning dates, missing calibration certificates, and template non-compliance
- Grid emission factor of 0.9368 tCO2/kWh is from 2018 and no baseline reassessment date is recorded in the available documents
- Low extraction confidence across the document set, with at least one key document poorly readable
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 86,802 | 80,000 | 6,802 | |
| 2019 | 677,920 | 471,726 | 206,194 | |
| 2020 | 697,972 | 49,717 | 648,255 | |
| 2021 | 675,358 | 364,143 | 311,215 | |
| 2022 | 633,136 | 102,222 | 530,914 | |
| 2023 | 528,875 | 73,015 | 455,860 | |
| 2024 | 675,012 | 423,488 | 251,524 | |
| 2025 | 322,335 | 86,317 | 236,018 | |
| Total | 4,297,410 | 1,650,628 | 2,646,782 |
Risk Indicators
VVB-confirmed combined test
Avoidance project – no reversal risk
0% – deemed negligible (grid displacement)
Jurisdictional but 2018 grid EF, no reassessment date
Grievance mechanism present; FPIC contradicted
CORSIA and CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →