Zhongdiantou Tacheng Mayitasi Phase II 49.5MW Wind Power Project
Developer: China Power Investment Corporation Xinjiang Energy Co., Ltd
Methodology: ACM0002 (CDM)
#3029of 4744 in Renewable energy#1566of 2787 in China#2994of 5269 in CDM (UNFCCC)#2180of 3246 in ACM0002
Score from methodology v2.1 (analysis of 25 Sep 2026). Re-assessment under v2.2 pending.
Assessment
Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.
Findings
Risk Indicators
🔒
🔒
🔒
🔒
🔒
🔒
Score Breakdown
Score factors per dimension are a Premium feature — Unlock with Premium
Gates applied
The gates applied to this score are a Premium feature — Unlock with Premium
Detailed Analysis
The detailed per-dimension analysis is a Premium feature — Unlock with Premium
Evidence
Eligibility & market
Under decision 4/CMP.20 of the Parties to the Kyoto Protocol (FCCC/KP/CMP/2025/7/Add.1, paragraph 5), the submission of requests for issuance of new CERs was discontinued as of 30 June 2026; requests to transfer CERs to the Article 6.4 mechanism registry, cancellations and any other transactions in the CDM registry are discontinued as of 31 December 2026. This page keeps the project's record and our analysis.
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
Not published
This registry does not publish CORSIA eligibility per project.
Integrity label (ICVCM CCP)
No ICVCM information
No CCP label and no ICVCM decision found for this project's methodology.
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: project sector
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
Not published
This registry does not publish Article 6 authorizations.
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Vintages
No issuances recorded on the registry.
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
Profile & governance
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Contest this rating
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Contest this rating →Similar projects
Same methodology or sector, the same registry first.
- Shanxi Wulushan 2nd phase Wind Power ProjectCDM-3060
- South Africa Wind EnergyCDM-6734
- Expansion Project of Sanjiangkou Hydro-electric Power Station in the reach of Supa River, Yunnan province, ChinaCDM-2075
- Ningxia Zhongning Changshantou Wind Farm CGN Dazhanchang 49.5MW Wind Power ProjectCDM-6154
- Huadian Erlianhaote Wind and Photovoltaic Power Generation ProjectCDM-7456
- Guodian Shuozhou Pinglu Hutoushan Wind Farm 249MW ProjectCDM-8458
- Wind power project by Sterling Agro Industries Ltd.CDM-6003
- Hydroelectric Project in Kinnaur District in Himachal PradeshCDM-4993
