Kinik Wind Power Plant
Developer: Esinti Enerji Uretim Ticaret ve Sanayi Anonim Sirketi
Methodology: ACM0002 (CDM)
Assessment
Analysis queued
This project is in the analysis queue and has not been rated yet. Registry data, credit vintages and purchase availability below reflect the latest registry snapshot; the quality score will appear here once the analysis completes.
Standard and methodology
Evidence
Eligibility & market
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
Pilot phase only (2021–2023)
Eligible only for the pilot phase: not usable for the current 2024–2026 phase.
Source: registry label · read on 1 Nov 2026
Covers: credits of this project that carry the label on the registry — not every unit or lot
Integrity label (ICVCM CCP)
Methodology not approved by ICVCMACM0002
The Integrity Council assessed this methodology as not meeting the Core Carbon Principles.
Source: ICVCM assessment · ICVCM table read on 4 Oct 2026
Covers: the methodology (every project using it), not this project's credits
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: methodology
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
No Article 6 authorization
No corresponding adjustment: the host country can also count this reduction towards its own target.
Source: registry label · read on 1 Nov 2026
Covers: this project's credit records as read on the registry
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Registry labels last checked:2026-11-01
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 7,605 | 7,605 | 0 | |
| 2017 | 83,198 | 83,198 | 0 | |
| 2018 | 90,495 | 31,308 | 59,187 | |
| 2019 | 97,634 | 3,043 | 94,591 | |
| 2020 | 102,225 | 715 | 101,510 | |
| 2021 | 92,564 | 52,866 | 39,698 | |
| 2022 | 43,968 | 1,000 | 42,968 | |
| Total | 517,689 | 179,735 | 337,954 |
Retired by
- European Bank for Reconstruction and Development44,909 t
- Pangolin7,019 t
- Corona Energy4,000 t
- Crown Gas & Power2,098 t
- Yusen Logistics Co.,Ltd2,000 t
- Saudi National Bank1,571 t
- Caffarel S.p.A1,500 t
- TRANSCONTAINER LIMITED800 t
- UNOENERGY INNOVATIVE SOLUTIONS S.R.L706 t
- Fruiz Marine Corp390 t
Organisations named as beneficiaries in the registry's public retirement records. (+2)
Where to buy
Got an offer for these credits? Check it against the registry →
Marketplaces
Each listing shows what the shop published on the day it was checked. The registry balance on this page is not a seller's stock, and some shops show no price.
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
Profile & governance
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Contest this rating
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Contest this rating →Similar projects
Same methodology or sector, the same registry first.
- 28MW Jinkouba Hydropower ProjectVCS-476
- Qingdao Longxin Wind Power Project Phase IVCS-969
- 300MW Hydropower Project By JHPLVCS-92
- Gansu Huanghe Bingling Hydropower Station ProjectVCS-453
- Karacabey Wind Power ProjectVCS-1569
- Sarigüzel Dam and Hydroelectric Power PlantsVCS-771
- Datong River Zhuchaxia Hydropower StationVCS-817
- Larimar Wind Farm ProjectVCS-1644
