Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

Re-assessment pending

26MWp Solar Photovoltaic Power Plant in Bavet City, Cambodia

Standard
VCS
Methodology
ACM0002 (CDM)
Registry
VCS-4036 ↗ · Registered
Country
Cambodia
Credit type
Energy industries (renewable/non-renewable sources)

Score from methodology v2.1 (analysis of 1 Sep 2026). Re-assessment under v2.2 pending.

Assessment

CarbonMeld document-based assessment

01020304 Overall 6.3 / 10 Dimension scores are locked — the faint arcs are empty tracks, not zero scores.

Scale 0–10 · method weights: integrity 35% · transparency 25% · claim safety 25% · documentation 15%.

Re-assessment pending · v2.1

How this analysis was made

Our method
CarbonMeld methodology v2.1 · analysed on 1 Sep 2026 · 12/12 registry documents analyzed · re-assessment under v2.2 pending

Analysis

A 26 MWp solar PV project in Cambodia verified under VCS ACM0002 with VVB-confirmed additionality and no material findings. The project is delivering at or above ex-ante estimates, but the verification report flags leakage as 'not addressed' (0% deduction) and several cross-document contradictions (baseline method, FPIC status, benefit sharing) reduce confidence in the consistency of the record.

Red Flags

3 red flags detected — Unlock with Premium

Findings

Risk Indicators

Additionality

🔒

Permanence

🔒

Leakage

🔒

Baseline

🔒

Safeguards

🔒

Double-claim

🔒

Risk indicator details are a Premium feature

Score Breakdown

Score factors per dimension are a Premium feature — Unlock with Premium

Gates applied

The gates applied to this score are a Premium feature — Unlock with Premium

Detailed Analysis

The detailed per-dimension analysis is a Premium feature — Unlock with Premium

Evidence

Unlock the full analysis

On this page: the analysis of 1 Sep 2026, marked “Re-assessment pending”. Per-dimension scores, risk indicators, 3 red flags, score factors, detailed analysis, and 12 registry documents (12 analyzed).

€9+ VAT per month · card subscription, renews automatically until you cancel

Every rated project, PDF reports, API access, portfolio alerts and per-dimension scores with red-flag details in side-by-side comparisons (public-data comparison is free; fair use: 30 projects per day). Cancel any time from your account page. Crypto: $9 for one month, no automatic renewal.

Enter your email to pay with crypto

Price + VAT · By subscribing or paying you accept the Terms of Use — the card subscription renews every month until you cancel; digital content, no refunds. How Premium works

Eligibility & market

What can you claim with this credit?

Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).

  • Airlines (CORSIA)

    No CORSIA label on the registry

    Not usable for airlines' CORSIA obligations.

    Source: registry label · read on 1 Nov 2026

    Covers: this project's credit records as read on the registry

  • Integrity label (ICVCM CCP)

    Methodology not approved by ICVCMACM0002

    The Integrity Council assessed this methodology as not meeting the Core Carbon Principles.

    Source: ICVCM assessment · ICVCM table read on 4 Oct 2026

    Covers: the methodology (every project using it), not this project's credits

  • Removal or reduction

    Emission reduction or avoidance

    Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.

    Source: project sector

    Covers: the project type, not a label on individual credits

  • Paris Agreement (Article 6)

    No Article 6 authorization

    No corresponding adjustment: the host country can also count this reduction towards its own target.

    Source: registry label · read on 1 Nov 2026

    Covers: this project's credit records as read on the registry

Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.

Credit Vintages

IssuedRetiredAvailable
2022
20,393020,393
2023
21,913021,913
2024
20,924020,924
Total63,230063,230

Methodology versions used

The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.

  1. 2022ACM0002 v21.0since replaced by v22.0

    verification report

    official page · verified on

  2. 2023–2024ACM0002 v21.0since replaced by v22.0

    monitoring report

    official page · verified on

  3. Period not statedACM0002 v21.0since replaced by v22.0

    verification report

    official page · verified on

  • ACM0002: Active (CDM / UNFCCC) · official page · verified on

A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.

Documents on the registry

Where to buy

Got an offer for these credits? Check it against the registry →

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

Profile & governance

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected] →

Contest this rating

Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.

Contest this rating →

Similar projects

Same methodology or sector, the same registry first.