Blitta – Togo Solar Power Plant

VCS-3298 ↗

#16of 770 in Renewable energy#25of 629 in Verra (VCS)#14of 383 in ACM0002

6.8/ 10
Integrity
6.5
Transparency
7.0
Claim Safety
7.0
Documentation
7.0

Audit Analysis

The Blitta Togo Solar Power Plant is a registered VCS renewable energy project (ACM0002 v20.0) with a VVB-confirmed investment additionality test and a jurisdictional grid-emission-factor baseline. The 2023 monitoring period yielded 44,551 tCO2e, verified by SustainCERT, though the verification report flagged a 33-day meter calibration delay and a calibration error exceeding permissible limits. Multiple contradictions across documents—particularly on FPIC status, baseline method, and leakage justification—introduce moderate data-reliability concerns that temper an otherwise sound project design.

Red Flags

  • Meter calibration delay of 33 days (Oct 2022 – Nov 2023) and a calibration error of +0.297% exceeding the ±0.2% permissible limit for 0.2S-class meters, requiring application of maximum permissible error per CDM V&V Standard para 366(a).
  • Seven contradictions across documents, including conflicting FPIC status (verification report: conducted; monitoring report: not conducted), conflicting baseline method (jurisdictional vs. project-specific), and conflicting leakage justification (not addressed vs. deemed negligible), all between documents dated the same day (2024-11-07).
  • Leakage deduction of 0% with justification described as 'not addressed' in the verification report, despite the monitoring report stating it was 'deemed negligible'—the VVB did not explicitly validate the leakage assumption.
  • Grid emission factor of 0.573 tCO2/MWh is from 2021, while the monitoring period is 2023; no updated grid factor or reassessment is documented.

Credit Vintages

IssuedRetiredAvailable
2021
24,40223,654748
2022
46,5676,69139,876
2023
44,551044,551
Total115,52030,34585,175

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Renewable energy – no reversal risk

Leakage

0% deduction, justification inconsistent

Baseline

Jurisdictional EF (2021), method contradicted in PDD

Safeguards

FPIC and benefit-sharing status contradictory

Double-claim

CORSIA-eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents