15 MW grid-connected wind power project by MMTC in Karnataka

CDM-1797 ↗

5.2 / 10
Integrity
5.8
Transparency
4.6
Claim Safety
4.9
Documentation
5.2

Score Breakdown

Integrity

verified The validation report confirms additionality through a combined test, and the VVB is named as TÜV NORD CERT GmbH.

missing Leakage treatment is disputed across documents, and reversal risk is not addressed beyond a wind project context.

Transparency

verified The monitoring report identifies the monitoring period and the registry is CDM, which gives some traceability.

missing Verified and claimed emission reduction totals are not stated in the extracted record, and the usage-monitoring method is not found.

Claim Safety

verified The project is a wind power activity under CDM, which generally lowers baseline and fuel-switching ambiguity compared with many other project types.

missing The baseline is project-specific rather than jurisdictional, leakage justification is contested, and CORSIA eligibility is true, which keeps dual-claim risk from being low.

Documentation

verified Multiple official document types were used, including validation, PDD, and monitoring material, and no corrective actions were required.

missing One extracted document is poorly characterized, extraction confidence is only medium, and the record does not clearly show a recent reassessment of the crediting setup.

Detailed Analysis

Integrity

The validation report confirms additionality using a combined test, and the VVB is identified as TÜV NORD CERT GmbH, which supports the core project case. No material findings or corrective actions were reported in the extracted record. Still, leakage is not consistently handled: the PDD describes it as negligible, while the validation report says it was not addressed, so I discount the score for reliability.

Transparency

The monitoring report provides a monitoring period from 2016-01-01 to 2017-12-31, and the project is clearly tied to the CDM registry. However, the extracted record does not state verified or claimed emission reduction totals, and the usage-monitoring method is not found. That leaves the MRV trail incomplete for external review.

Claim Safety

This is a wind project, so the baseline risk is lower than for many fuel-based activities, but the baseline method is project-specific rather than a more standardized jurisdictional approach. The leakage justification is contradictory across documents, which raises over-crediting concern. CORSIA eligibility is true, while CCP status is not stated, so dual-market claim risk is not eliminated.

Documentation

The record draws on multiple official sources, including validation, PDD, and monitoring documents, and the VVB is named. FPIC, grievance mechanism, and benefit-sharing are all mentioned, which helps the documentation picture. Even so, extraction confidence is only medium, one document is poorly characterized, and the crediting period is inconsistent across documents, reducing documentation quality.

Overall

I privileged the validation report where it conflicts with the PDD or an unidentified later source because it is the higher-priority assurance document and is dated and specific. That means I follow the validation report on the combined additionality test, the not-addressed leakage treatment, and the earlier crediting period, while noting the PDD’s conflicting negligible-leakage statement as a reliability issue. The contradictions do not invalidate the project, but they do reduce confidence and keep the overall score in the mid range.

Audit Analysis

This is a CDM wind project with VVB-confirmed additionality and no material findings reported, which supports basic integrity. However, several key items are either not stated or inconsistent across documents, including leakage treatment, crediting period timing, and the absence of verified emission reduction totals, which weakens confidence in the claim.

Project Description

Status: Registered Type: PA Methodology: AMS-I.D. Project type: Wind Sub-type: Wind Region: Asia & Pacific Sub-region: Southern Asia Reductions 1st period: 21.927 ktCO2e/yr

Red Flags

  • Leakage is inconsistently described: the PDD says it is negligible, while the validation report says it is not addressed.
  • The crediting period differs between documents, and the record also lacks verified emission reduction totals and a public usage-monitoring method.

Credit Vintages

Issued Retired Available
2012
21,449 0 21,449
2020
40,751 0 40,751
Total 62,200 0 62,200

Cosa migliorerebbe questo punteggio

  • Provide a reconciled, document-controlled explanation for the leakage treatment and crediting period discrepancy, with the latest authoritative source clearly identified.
  • Publish verified emission reduction totals and the usage-monitoring method, along with clearer registry and eligibility information to reduce claim-risk uncertainty.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

No reversal events, but no buffer detail

Leakage

Leakage treatment disputed

Baseline

Project baseline, reassessment timing unclear

Safeguards

FPIC and grievance mechanism present

Double-claim

CORSIA-eligible, CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-13 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti