23.1 MW Wind power project in Telagi, Karnataka
GS-2632 ↗ · current registry ID: GS7788
#46of 770 in Renewable energy#27of 387 in India#15of 426 in Gold Standard (GS)#32of 383 in ACM0002
Audit Analysis
A 23.1 MW wind project in Karnataka with VVB-confirmed additionality and no material findings, but hampered by contradictory ERR figures across monitoring reports, an unaddressed leakage justification in the verification report, and a project-specific baseline that conflicts with the monitoring report's jurisdictional characterization. The project is CORSIA-eligible and the crediting period has already expired, limiting forward-looking credit availability.
Red Flags
- ERR figures contradict between two monitoring reports: 59,500 tCO2e (June 2025 report) vs 79,976 tCO2e (October 2024 report), with the verified figure matching the higher value — the basis for the discrepancy is unexplained
- Leakage justification is recorded as 'not addressed' in the verification report, despite a 0% deduction being applied; the monitoring report states 'deemed negligible' but the VVB document does not confirm this
- Reversal events are marked as 'not addressed' in the extracted record, and no buffer pool percentage is stated, leaving permanence risk unquantified
- Crediting period ended 20 February 2022, yet the verification report is dated 24 June 2025 — the project is no longer generating new credits
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 20,204 | 0 | 20,204 | |
| 2021 | 35,419 | 0 | 35,419 | |
| 2022 | 3,877 | 0 | 3,877 | |
| Total | 59,500 | 0 | 59,500 |
Risk Indicators
VVB-confirmed investment test
Avoidance project but reversal unaddressed, no buffer pool s
0% deduction reasonable for wind but justification not confi
Project-specific baseline; method contradicts monitoring rep
FPIC conducted, grievance mechanism present, safeguards docu
CORSIA-eligible confirmed; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →