26 MW Bagasse Based Co-Generation ( Vitthal Refined Sugar Ltd ) by Energy Advisory Services
#141of 196 in Biomass#156of 421 in Universal Carbon Registry (UCR)#27of 53 in ACM0006
Audit Analysis
This 26 MW bagasse cogeneration project under the UCR registry relies on a single PDD document with no verification or monitoring reports available. While the jurisdictional baseline and established ACM0006 methodology provide a reasonable methodological foundation, the absence of additionality evidence, permanence mechanisms, and any verified emission reduction figures creates significant uncertainty about the project's actual creditworthiness.
Red Flags
- No verification report, monitoring report, or VVB report is available — only the PDD was extracted, leaving the claimed 367,200 tCO2e entirely unverified
- Additionality test type and VVB confirmation are not stated in any available document
- The PDD is dated 15 June 2022, which is after the crediting period end date of 31 March 2022 — an unusual sequencing that raises questions about the registration timeline
- No buffer pool, permanence mechanism, or reversal-risk treatment is documented
- CORSIA eligibility and CCP status are not stated, leaving dual-channel risk unassessed
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test or VVB confirmation found
No buffer pool or permanence mechanism stated
0% deemed negligible — reasonable but thinly justified
Jurisdictional baseline, no reassessment date stated
Safeguards and benefit sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →