Skip to main content
UCRBrazilACM0006

73.5 MW Sugarcane Bagasse based co-generation Energy GRUPO OLHO D’ÁGUA

UCR-590 ↗

#119of 196 in Biomass#86of 104 in Brazil#85of 421 in Universal Carbon Registry (UCR)#15of 53 in ACM0006

3.8/ 10
Integrity
4.0
Transparency
3.0
Claim Safety
5.0
Documentation
3.0

Audit Analysis

This 73.5 MW sugarcane bagasse co-generation project in Brazil relies solely on a PDD with no verification reports, monitoring reports, or identified verification body. While the jurisdictional baseline and absence of material findings are positive, the complete absence of VVB confirmation, additionality verification, and verified emission reductions leaves critical integrity and transparency gaps unaddressed.

Red Flags

  • No verification body (VVB) is identified in any available document, making it impossible to confirm that additionality was independently verified
  • No monitoring reports or verified emission reduction figures are available for the 2013–2025 crediting period
  • Leakage deduction of 0% is justified only as 'deemed negligible' without a quantified analysis in the available record

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type and VVB verification not stated in available recor

Permanence

No buffer pool or reversal data; biomass risk lower but unco

Leakage

0% deduction, 'deemed negligible' without quantified analysi

Baseline

Jurisdictional method used but no reassessment date or VVB c

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available record

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19ACM0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents