27.5 MW Biomass Based Grid Connected Electricity Generation Project in DCM Shriram, Ajbapur Plant

UCR-416 ↗

#172of 196 in Biomass#309of 421 in Universal Carbon Registry (UCR)#42of 53 in ACM0006

3.0/ 10
Integrity
3.5
Transparency
1.5
Claim Safety
4.5
Documentation
2.0

Audit Analysis

This 27.5 MW biomass power project in Uttar Pradesh, India, is registered under the UCR standard using CDM methodology ACM0006 v16.0, but the available record consists solely of a PDD dated September 2023 with no verification, monitoring, or VVB reports. Critical integrity elements — additionality testing, VVB identity, baseline reassessment, and permanence safeguards — are absent from the extracted record, and the 0% leakage deduction rests on a thin 'quantified' justification. The claimed lifetime ERR of 151,372 tCO₂ appears conservative relative to the plant's nameplate capacity, but without verified monitoring data the claim cannot be independently corroborated.

Red Flags

  • No verification or monitoring report is present in the record; the sole document is a PDD dated 2023-09-28, leaving the entire 2015–2023 operational history unverified.
  • Additionality test type and VVB confirmation are not stated in the extracted record, and no VVB name is identified, making it impossible to confirm that additionality was independently assessed.
  • Permanence risk is unaddressed: no buffer pool percentage is stated and no reversal-event history is available for the full eight-year crediting period.
  • Leakage deduction is 0% with only a one-word 'quantified' justification; no supporting calculation or narrative is found in the available document.

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

No additionality test or VVB confirmation found in record

Permanence

No buffer pool stated; reversal history not available

Leakage

0% deduction with minimal 'quantified' justification

Baseline

Project-specific baseline; no reassessment date recorded

Safeguards

Safeguards mentioned; FPIC and grievance mechanism not state

Double-claim

CORSIA and CCP status not stated in available record

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19ACM0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents