27.5 MW Biomass Based Grid Connected Electricity Generation Project in DCM Shriram, Ajbapur Plant
#172of 196 in Biomass#309of 421 in Universal Carbon Registry (UCR)#42of 53 in ACM0006
Audit Analysis
This 27.5 MW biomass power project in Uttar Pradesh, India, is registered under the UCR standard using CDM methodology ACM0006 v16.0, but the available record consists solely of a PDD dated September 2023 with no verification, monitoring, or VVB reports. Critical integrity elements — additionality testing, VVB identity, baseline reassessment, and permanence safeguards — are absent from the extracted record, and the 0% leakage deduction rests on a thin 'quantified' justification. The claimed lifetime ERR of 151,372 tCO₂ appears conservative relative to the plant's nameplate capacity, but without verified monitoring data the claim cannot be independently corroborated.
Red Flags
- No verification or monitoring report is present in the record; the sole document is a PDD dated 2023-09-28, leaving the entire 2015–2023 operational history unverified.
- Additionality test type and VVB confirmation are not stated in the extracted record, and no VVB name is identified, making it impossible to confirm that additionality was independently assessed.
- Permanence risk is unaddressed: no buffer pool percentage is stated and no reversal-event history is available for the full eight-year crediting period.
- Leakage deduction is 0% with only a one-word 'quantified' justification; no supporting calculation or narrative is found in the available document.
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test or VVB confirmation found in record
No buffer pool stated; reversal history not available
0% deduction with minimal 'quantified' justification
Project-specific baseline; no reassessment date recorded
Safeguards mentioned; FPIC and grievance mechanism not state
CORSIA and CCP status not stated in available record
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →