TEIL Biomass Grid Supply Power Project, Deoband, Uttar Pradesh

UCR-328 ↗

#177of 196 in Biomass#356of 421 in Universal Carbon Registry (UCR)#46of 53 in ACM0006

2.9/ 10
Integrity
3.5
Transparency
1.5
Claim Safety
4.0
Documentation
2.0

Audit Analysis

The TEIL Biomass Grid Supply Power Project in Deoband, Uttar Pradesh is registered under the UCR standard using a CDM methodology (ACM0006 v16.0) with a jurisdictional baseline and a claimed 632,500 tCO₂e over a 10-year crediting period. However, the available record consists solely of a single PDD; no verification report, monitoring report, or VVB identification was found, leaving additionality, verified emissions reductions, and permanence protection entirely unconfirmed. The 0% leakage deduction rests on a thin 'deemed negligible' justification, and no buffer pool or reversal-risk mitigation is documented.

Red Flags

  • No verification body (VVB) is identified in any available document, and no additionality test type or VVB confirmation of additionality was found in the extracted record.
  • Only a single PDD (dated 2023-05-08) is available; no verification report, monitoring report, or VVB audit report was located, making it impossible to confirm that the 632,500 tCO₂e claim was independently verified.
  • Leakage deduction is 0% with only a 'deemed negligible' justification, which is thin for a biomass project where displaced fuel use (cooking, heating) is a plausible leakage pathway.
  • No buffer pool, permanence protection mechanism, or reversal-event tracking is documented, leaving the project's long-term integrity unsecured.
  • The PDD is dated May 2023, after the 2013–2022 crediting period had already ended, raising questions about whether the project was retroactively registered or the PDD was a late revision.

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

No additionality test or VVB confirmation found

Permanence

No buffer pool; lower reversal risk for power but unaddresse

Leakage

0% deemed negligible; thin justification for biomass

Baseline

Jurisdictional baseline; no reassessment date stated

Safeguards

Mentioned but no FPIC or grievance mechanism details

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-20ACM0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents