82 MW Bagasse-Based Co-generation at DSPL, Pune, Maharashtra
#162of 196 in Biomass#283of 421 in Universal Carbon Registry (UCR)#38of 53 in ACM0006
Audit Analysis
This 82 MW bagasse cogeneration project under the UCR registry has a jurisdictional baseline and a reasonable leakage justification, but the available record consists solely of a Project Design Document with no verification reports, monitoring reports, or VVB assessments. Additionality, permanence safeguards, and actual emissions performance remain entirely unverified, making it impossible to confirm that the 46,022 claimed emission reduction units are supported by evidence.
Red Flags
- No verification report, monitoring report, or VVB assessment is present in the available record — only a PDD dated 2024-12-02 was extracted
- Additionality test type and VVB verification are not stated in any available document
- No buffer pool or permanence mechanism is documented for a 10-year crediting period
- No Free, Prior and Informed Consent (FPIC) or grievance mechanism is documented despite safeguards being mentioned
- Zero leakage deduction is justified only as 'deemed negligible' with no quantified analysis
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type not stated; no VVB verification found
No buffer pool documented; reversal risk unaddressed
0% deduction, 'deemed negligible' without quantified analysi
Jurisdictional baseline; reassessment timing not stated
Mentioned in PDD but no FPIC or grievance mechanism document
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →