132 MW Sugarcane Bagasse based co-generation Energy USINA CORURIPE
#147of 196 in Biomass#94of 104 in Brazil#180of 421 in Universal Carbon Registry (UCR)#30of 53 in ACM0006
Audit Analysis
The 132 MW sugarcane bagasse co-generation project at Usina Coruripe (UCR-545) uses a jurisdictional baseline and a recognised CDM methodology (ACM0006 v16), but the extracted record contains only a single PDD with no verification report, monitoring report, or VVB assessment. Critical integrity elements — additionality testing, functional newness/replacement baseline, and verified emission reductions — are absent from the available documents, making it impossible to independently confirm the 76,149 tCO₂e claim. The PDD is dated 18 June 2025, which post-dates the 2013–2024 crediting period, raising questions about document provenance.
Red Flags
- Only a PDD is available in the extracted record; no verification report, monitoring report, or VVB assessment was found, leaving additionality, permanence, and MRV unverified.
- The PDD is dated 18 June 2025, which is after the end of the 2013–2024 crediting period; the document's origin and purpose are unclear.
- No verified emission-reduction figure is available to cross-check against the 76,149 tCO₂e lifetime claim.
- Leakage is set at 0% on the basis of a 'deemed negligible' justification with no quantitative displacement or substitution analysis provided.
- Functional newness / replacement baseline (FN/RB) method and value are not stated in any available document.
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type and VVB confirmation not stated in available docum
No buffer-pool or reversal-event data found; unassessed
0% deduction with 'deemed negligible' justification, no quan
Jurisdictional baseline stated in PDD
Safeguards mentioned and benefit-sharing described, but FPIC
CORSIA eligibility and CCP status not stated in available do
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →