TEIL Biomass Grid Supply Power Project, Khatauli , Uttar Pradesh
#156of 196 in Biomass#232of 421 in Universal Carbon Registry (UCR)#35of 53 in ACM0006
Audit Analysis
The TEIL Biomass Grid Supply Power Project in Uttar Pradesh relies on a jurisdictional baseline under ACM0006 and reports no material findings, but the available record consists of a single PDD with no verification report, no monitoring report, and no VVB identification. The claimed 539,700 tCO₂e over the 2017–2021 crediting period cannot be independently corroborated, and key integrity elements such as additionality testing, buffer pool allocation, and leakage justification remain unconfirmed in the extracted data.
Red Flags
- Only one document (the PDD) is available; no verification report, monitoring report, or VVB report was found in the extracted record, making independent verification of the 539,700 tCO₂e claim impossible.
- The PDD is dated 22 September 2022, which is after the crediting period ended on 31 December 2021, raising questions about whether the project design was documented retrospectively.
- No buffer pool percentage is stated and no VVB is identified, leaving permanence risk for a biomass supply project unaddressed in the available record.
- Additionality test type and VVB confirmation are both absent from the extracted data, so the additionality claim cannot be independently assessed.
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type and VVB confirmation not stated in available recor
No buffer pool stated; biomass supply risk unaddressed
0% deemed negligible; justification is a label, not a quanti
Jurisdictional baseline under ACM0006 v16.0
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available record
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →