120 MW Sugarcane Bagasse based co-generation Energy SJC BIOENERGIA
#122of 196 in Biomass#89of 104 in Brazil#97of 421 in Universal Carbon Registry (UCR)#16of 53 in ACM0006
Audit Analysis
This 120 MW sugarcane bagasse co-generation project in Brazil uses a jurisdictional baseline and a CDM methodology (ACM0006 v16) under the UCR registry, but the available record consists solely of a PDD with no verification reports, monitoring reports, or identified VVB. Additionality is unverified, the leakage deduction is 0% on a thin 'deemed negligible' basis, and no buffer pool or permanence mechanism is documented, leaving significant evidence gaps across all four scoring dimensions.
Red Flags
- No verification report or VVB is identified in the available record; additionality test type and VVB confirmation are entirely absent
- Only a single PDD (dated 2025-02-05) is available; no monitoring reports, verification reports, or MRV data for the 2013–2024 period can be confirmed
- Leakage deduction is 0% justified only as 'deemed negligible' with no quantitative analysis, which is a weak basis for a co-generation project displacing grid electricity
- No buffer pool percentage, reversal event history, or permanence mechanism is stated in the available documents
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No test type or VVB confirmation found
No buffer pool or reversal data stated
0% deduction, 'deemed negligible' only
Jurisdictional method, reassessment timing unknown
Mentioned and benefit sharing described, FPIC/grievance unst
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →