Skip to main content
UCRSolarpur Maharashtra IndiaACM0006

Cogeneration Plant by Shree Siddheshwar Sahakari Sakhar Karkhana Ltd. Solapur

UCR-379 ↗

#181of 202 in Industrial#111of 421 in Universal Carbon Registry (UCR)#17of 53 in ACM0006

3.7/ 10
Integrity
4.5
Transparency
2.0
Claim Safety
5.0
Documentation
2.5

Audit Analysis

A sugar-mill cogeneration project under the UCR registry using the well-established ACM0006 methodology, with a jurisdictional baseline and smart-meter monitoring. However, the available record consists solely of the PDD — no verification report, monitoring report, or VVB identification was found, leaving additionality, permanence, and verified emissions reductions unconfirmed. The project is structurally sound but evidentially thin.

Red Flags

  • No verification body (VVB) is identified in the available record; additionality verification status is unknown
  • No verified emissions reduction figure exists — only the ex-ante claim of 92,340 tCO2e is available
  • No buffer pool or permanence risk mitigation is documented for the cogeneration asset
  • FPIC and grievance mechanism are not documented despite safeguards being mentioned

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Methodology requires it but no test type or VVB verification

Permanence

No buffer pool or permanence safeguard documented; no revers

Leakage

0% deduction with 'deemed negligible' justification; no quan

Baseline

Jurisdictional baseline (positive) but no reassessment date

Safeguards

Safeguards mentioned; FPIC and grievance mechanism not docum

Double-claim

CORSIA and CCP eligibility both unknown; dual-channel risk u

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19ACM0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents