23.5 MW Biomass based power supply to grid at Gularia, Uttar Pradesh
#179of 196 in Biomass#362of 421 in Universal Carbon Registry (UCR)#47of 53 in ACM0006
Audit Analysis
This 23.5 MW biomass power project under the UCR registry presents a significant evidence gap: only a single Project Design Document is available, with no verification report, monitoring report, or identified verification body. The additionality assessment is undocumented, the baseline is project-specific with no reassessment record, and the claimed 104,976 ERR figure has no verified counterpart. While no material findings or corrective actions are reported, the absence of independent verification and the PDD being dated after the crediting period ended raise serious concerns about the robustness of the credit claims.
Red Flags
- No verification body (VVB) is identified in any available document; additionality is neither tested nor independently confirmed
- The PDD is dated 15 March 2023, which is after the crediting period ended on 31 December 2022, suggesting retroactive documentation or a registration irregularity
- Only one document (the PDD) is available; no verification report, monitoring report, or VVB audit report was found
- The claimed 104,976 ERR has no verified counterpart; no monitoring period or verified emissions figure is stated
- Leakage deduction is 0% with only a one-word 'quantified' justification, providing no substantive explanation
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No test type stated, no VVB confirmation
No buffer pool, no reversal data
0% deduction, thin justification
Project-specific, no reassessment date
Mentioned but FPIC and grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →