Audit Analysis
This 7.9 MW biomass cogeneration project under the UCR registry (ACM0006 v16) has an extremely thin evidence base, with only a single PDD available and no verification, monitoring, or VVB reports in the extracted record. Critical integrity elements such as the additionality test type, VVB confirmation, and baseline reassessment date are absent from the available data, making it impossible to independently confirm the project's core claims. The leakage treatment (0%, deemed negligible) is reasonable for agricultural-residue use in a distillery, but the overall documentation gap significantly limits confidence in the project's credit quality.
Red Flags
- No additionality test type or VVB verification found in the extracted record despite a PDD being present — a fundamental requirement for any carbon credit project is unconfirmed
- Only one document (PDD) is available; no verification report, monitoring report, or VVB report could be located, leaving ERR claims entirely unverifiable
- No buffer pool percentage stated and no reversal-event data available, leaving permanence risk unquantified
- Baseline is project-specific with no reassessment date recorded, reducing robustness compared to a jurisdictional or standardised baseline
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type and VVB verification not confirmed in available da
No buffer pool or reversal data; cogeneration risk lower but
0% deduction, deemed negligible — consistent with agricultur
Project-specific baseline, no reassessment date recorded
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status both not stated — dual-channel risk un
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →