5 MW Biomass based power supply to grid at Maizapur, Uttar Pradesh
#173of 196 in Biomass#313of 421 in Universal Carbon Registry (UCR)#43of 53 in ACM0006
Audit Analysis
This 5 MW biomass power project under the UCR registry relies on a single PDD document with no verification report, monitoring report, or VVB identification available. While the methodology (ACM0006 v16.0) is well-established and the grid emission factor of 0.9 tCO₂/MWh is reasonable for the Indian grid, the absence of additionality evidence, a named verification body, and any verified emissions reduction figures creates significant uncertainty about the project's integrity and claim safety.
Red Flags
- No verification body (VVB) is identified in any available document, and no additionality test type or VVB confirmation of additionality is recorded
- Only a single PDD (dated 2024-06-20) is available; no verification report, monitoring report, or VVB audit report was found
- Leakage deduction is 0% with only the word 'quantified' as justification — no supporting calculation or narrative is provided
- No verified ERR figure exists to validate the 17,496 tCO₂e claimed over the crediting period
- CORSIA eligibility and CCP status are both unstated, leaving double-claiming risk unassessed
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test or VVB confirmation found
Avoidance project, no buffer pool, no reversal data
0% deduction, justification limited to 'quantified'
Project-specific baseline, no reassessment date
Mentioned and benefit sharing described, FPIC/grievance unco
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →