Chilwaria Biomass Grid Supply Power Project, Bahraich, Uttar Pradesh
#135of 196 in Biomass#139of 421 in Universal Carbon Registry (UCR)#23of 53 in ACM0006
Audit Analysis
The Chilwaria biomass power project uses a jurisdictional baseline and ACM0006 methodology, which are structurally sound, but the available record consists solely of a PDD with no verification reports, no identified VVB, and no verified emission reduction figures. Additionality verification, permanence safeguards, and independent MRV evidence are absent from the extracted record, leaving significant evidence gaps that limit confidence in the claimed 120,727 tCO₂ over the 2013–2021 crediting period.
Red Flags
- No VVB (Verification and Validation Body) is identified in the available record, making independent verification of additionality and baseline unverifiable
- No verification or monitoring reports are present — only a PDD is available, so the claimed 120,727 tCO₂ has no independent corroboration
- Additionality test type and VVB confirmation are not stated in the extracted record, leaving the additionality claim unverified
- No buffer pool or permanence risk management mechanism is documented for the biomass fuel supply
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type not stated; no VVB confirmation found
No buffer pool or permanence safeguards documented
0% deemed negligible — reasonable for dedicated biomass powe
Jurisdictional method but reassessment timing not stated
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated — dual-channel risk unasses
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →