Skip to main content
UCRBrazilACM0006

90 MW Sugarcane Bagasse based co-generation Energy BEVAP Bioenergia

UCR-530 ↗

#143of 196 in Biomass#93of 104 in Brazil#170of 421 in Universal Carbon Registry (UCR)#29of 53 in ACM0006

3.5/ 10
Integrity
4.5
Transparency
2.0
Claim Safety
4.0
Documentation
2.5

Audit Analysis

A 90 MW sugarcane bagasse co-generation project in Brazil registered under the UCR standard, with a jurisdictional baseline and smart-meter monitoring, but critically lacking any verification or monitoring reports in the available record. The absence of a named verification body, verified emissions figures, and a confirmed additionality test leaves the project's core claims unvalidated. The single PDD document provides a reasonable structural foundation but cannot substitute for independent verification.

Red Flags

  • No verification body (VVB) is identified in the available record, and no verification or monitoring reports were found — the 58,191 tCO₂e claim stands entirely unverified
  • Additionality test type and VVB confirmation are both absent from the extracted data, leaving the additionality claim unconfirmed
  • Leakage deduction is 0% with only a 'deemed negligible' label and no quantified justification in the available documents
  • No buffer pool percentage is stated, leaving permanence risk unquantified for the 12-year crediting period

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test not confirmed by VVB

Permanence

No buffer pool; low inherent risk

Leakage

0% deduction, thin justification

Baseline

Jurisdictional; no reassessment date

Safeguards

Grievance present; FPIC unconfirmed

Double-claim

CORSIA and CCP status unknown

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19ACM0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents