30 MW Bagasse based co-generation at M/S SDVSSKL; Bidri , Kolhapur Maharashtra.
#151of 196 in Biomass#209of 421 in Universal Carbon Registry (UCR)#33of 53 in ACM0006
Audit Analysis
This 30 MW bagasse cogeneration project under the UCR registry relies on the well-established ACM0006 methodology with a jurisdictional baseline and a reasonable 0% leakage deduction for a waste-biomass project. However, the available record consists solely of a PDD with no verification reports, no monitoring reports, no identified VVB, and no documented additionality test, leaving critical integrity and transparency questions unanswered.
Red Flags
- No additionality test type or VVB verification is documented in the available record; the PDD does not specify which additionality criteria were applied or by whom they were confirmed.
- Only a single document (the PDD) is available; no verification report, monitoring report, or VVB identification exists in the extracted record, making it impossible to confirm that claimed emissions reductions were independently verified.
- No buffer pool or permanence mechanism is stated, and no reversal events are recorded — the permanence risk for a 12-year crediting period is unaddressed in the available documentation.
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test or VVB verification found in available
No buffer pool or permanence mechanism stated; no reversal e
0% deduction deemed negligible — appropriate for bagasse was
Jurisdictional baseline stated but no reassessment date or g
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA eligibility and CCP status not stated in available do
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →