20 MW Biomass based Grid connected Biomass Power Project of M/s Shiraguppi Sugar Works Ltd by EASPL
#150of 196 in Biomass#7of 17 in Karnataka India#205of 421 in Universal Carbon Registry (UCR)#32of 53 in ACM0006
Audit Analysis
A 20 MW biomass power project in Karnataka registered under the UCR registry using CDM methodology ACM0006, with a jurisdictional baseline and a claimed 278,000 tCO2e over a ~9.7-year crediting period. The available record consists solely of a PDD; no verification report, monitoring report, or VVB assessment was found, making it impossible to confirm additionality, verify emissions reductions, or assess MRV quality. The project shows no material findings or contradictions, but the absence of independent verification and permanence safeguards limits confidence in the claimed credits.
Red Flags
- No verification report, monitoring report, or VVB assessment found in the available record — additionality and MRV cannot be independently confirmed
- No buffer pool or permanence safeguard identified for a project whose credits span nearly a decade
- Leakage deduction of 0% justified only as 'deemed negligible' with no quantified analysis in the extracted record
- PDD dated 2022-12-21, which falls at the very end of the crediting period (2013–2022), raising questions about the timing and completeness of the project documentation
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No test type or VVB verification found in record
No buffer pool; no reversal events but no safeguard
0% deemed negligible; no quantified analysis
Jurisdictional method, grid EF 0.9; no reassessment date
Mentioned in PDD; no FPIC or grievance mechanism detail
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →