26 MW Bagasse based Co-generation plant by M/s SMSNNSSKL, Shrigonda Factory, Ahmednagar, Maharashtra
#158of 196 in Biomass#250of 421 in Universal Carbon Registry (UCR)#37of 53 in ACM0006
Audit Analysis
A 26 MW bagasse cogeneration project under the UCR registry with a recognised CDM methodology (ACM0006 v16) and a 10% buffer pool, but the available record consists of a single PDD with no verification report, no identified VVB, and no verified emissions-reduction figure. Additionality, leakage, and baseline robustness cannot be independently confirmed from the extracted documents, leaving material evidence gaps across all four scoring dimensions.
Red Flags
- No verification body (VVB) is identified in the available record; the additionality test type and VVB confirmation are both absent, so additionality cannot be independently verified.
- Only one document (the PDD) is available; no verification report, monitoring report, or VVB audit report was found, making it impossible to confirm the 15,336 tCO₂e claim or the 0% leakage deduction.
- The PDD is dated 15 June 2024, which post-dates the end of the crediting period (31 December 2023), raising questions about whether this is the original design document or a later revision.
- Leakage is set at 0% on the basis of a 'deemed negligible' justification with no quantified analysis, which is thin for a cogeneration project where displaced bagasse combustion or grid-supplied electricity could generate leakage.
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type not stated; VVB confirmation absent
10% buffer pool present; no reversal events found but not co
0% deduction, 'deemed negligible' only—no quantified analysi
Project-specific; no reassessment date recorded
Mentioned and benefit-sharing described; FPIC and grievance
CORSIA and CCP status both not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →