105 MW Sugarcane Bagasse based co-generation Energy USINA CERRADÃO
#138of 196 in Biomass#91of 104 in Brazil#148of 421 in Universal Carbon Registry (UCR)#24of 53 in ACM0006
Audit Analysis
The USINA CERRADÃO co-generation project presents a jurisdictional baseline and a 12-year crediting period with 47,902 tCO₂e claimed, but the available record consists solely of a project design document. No verification report, monitoring report, or VVB confirmation is present, leaving additionality, permanence, and verified emissions reductions entirely unconfirmed. The project's fundamental design elements are reasonable for a bagasse co-generation facility, but the evidentiary base is too thin to support a high-confidence assessment.
Red Flags
- No verification report or VVB confirmation found in the available record; additionality is neither tested nor verified by an independent body
- Only one document (the PDD) is available; no monitoring reports, verification reports, or registry records are present to confirm actual emissions reductions
- The PDD is dated 18 December 2025, which post-dates the end of the 12-year crediting period (31 December 2024), raising questions about the document's role and the project's actual registration timeline
- No buffer pool, reversal risk assessment, or permanence mechanism is documented for a project spanning 12 years
- No functional and net radiative forcing (FN/RB) value or method is stated, leaving the climate-relevant adjustment to the claimed reductions unquantified
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test or VVB verification found
No buffer pool or reversal assessment documented
0% deduction, 'deemed negligible' justification only
Jurisdictional baseline stated, no reassessment date
Grievance and benefit-sharing noted, FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →