35MW Bagasse based co-generation at M/S Bhimashankar Sahakari Sakhar Karkhana Ltd (BSSKL) Pune, MH
#109of 196 in Biomass#62of 421 in Universal Carbon Registry (UCR)#13of 53 in ACM0006
Audit Analysis
A 35 MW bagasse cogeneration project under the UCR registry with a well-established methodology (ACM0006 v16), but the available record consists solely of a PDD with no verification or monitoring reports. Additionality testing, VVB confirmation, and verified emission reductions are absent from the extracted data, creating significant evidence gaps that limit confidence in the project's integrity and transparency.
Red Flags
- No additionality test type or VVB confirmation found in the available PDD record
- No verified ERR figure available to validate the 29,930 tCO2e lifetime claim
- Only a single document (PDD) is in the evidence base — no verification or monitoring reports
- Leakage deduction of 0% justified only as 'deemed negligible' without quantified analysis
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test not documented in available record
No buffer pool or reversal data stated
0% deduction, deemed negligible, thin justification
Project-specific, no reassessment date
Mentioned but FPIC and grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →