Biomass based Cogeneration Project at Haidergarh, Uttar Pradesh
#133of 196 in Biomass#137of 421 in Universal Carbon Registry (UCR)#21of 53 in ACM0006
Audit Analysis
A biomass cogeneration project in Uttar Pradesh, India, registered under the UCR standard with a claimed 63,805 tCO₂e over a 10-year crediting period. The project relies on a project-specific baseline and a 0% leakage deduction (justified as quantified), but the available record contains only the PDD — no verification report, monitoring report, or independent VVB assessment was found. The absence of additionality verification, monitoring data, and any buffer pool mechanism leaves significant evidence gaps that limit confidence in the project's integrity and claim safety.
Red Flags
- No verification body (VVB) is identified in the available record; additionality was not confirmed by an independent verifier
- Only a single document (the PDD) is available; no verification report, monitoring report, or VVB audit report was found
- No buffer pool or permanence risk mitigation mechanism is documented for the project
- The PDD is dated 21 February 2023, which post-dates the end of the crediting period (31 December 2022), raising questions about the project's operational timeline
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test not confirmed by VVB in available record
No buffer pool; avoidance project with no reversal events re
0% deduction with quantified justification
Project-specific baseline; no reassessment date stated
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available record
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →