Skip to main content
UCRVillage: Pokhra Tehsil: Haidergarh District: Barabanki State: Uttar Pradesh India.ACM0006

Biomass based Cogeneration Project at Haidergarh, Uttar Pradesh

UCR-297 ↗

#133of 196 in Biomass#137of 421 in Universal Carbon Registry (UCR)#21of 53 in ACM0006

3.6/ 10
Integrity
4.5
Transparency
2.0
Claim Safety
4.5
Documentation
2.5

Audit Analysis

A biomass cogeneration project in Uttar Pradesh, India, registered under the UCR standard with a claimed 63,805 tCO₂e over a 10-year crediting period. The project relies on a project-specific baseline and a 0% leakage deduction (justified as quantified), but the available record contains only the PDD — no verification report, monitoring report, or independent VVB assessment was found. The absence of additionality verification, monitoring data, and any buffer pool mechanism leaves significant evidence gaps that limit confidence in the project's integrity and claim safety.

Red Flags

  • No verification body (VVB) is identified in the available record; additionality was not confirmed by an independent verifier
  • Only a single document (the PDD) is available; no verification report, monitoring report, or VVB audit report was found
  • No buffer pool or permanence risk mitigation mechanism is documented for the project
  • The PDD is dated 21 February 2023, which post-dates the end of the crediting period (31 December 2022), raising questions about the project's operational timeline

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test not confirmed by VVB in available record

Permanence

No buffer pool; avoidance project with no reversal events re

Leakage

0% deduction with quantified justification

Baseline

Project-specific baseline; no reassessment date stated

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available record

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19ACM0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents