Carbon Credit Generation Project by NSL Sugars Ltd. Aland Unit Karnataka, India
#353of 421 in Universal Carbon Registry (UCR)#45of 53 in ACM0006
Audit Analysis
This UCR-registered biomass energy project (ACM0006) by NSL Sugars in Karnataka claims 83,955 tCO₂e over a 12-year crediting period, but the available documentation is extremely limited — only a PDD and one unidentified document were extracted with low confidence. No additionality test, VVB verification, verified ERR, or baseline reassessment date could be found, leaving the core integrity claims unverified. The project's energy-sector nature makes the 0% leakage deduction plausible, but the overall evidentiary base is too thin to support a high-confidence assessment.
Red Flags
- No additionality test type or VVB verification found in any available document — a fundamental requirement for any carbon credit project is absent from the record
- No verified ERR figure available; the 83,955 tCO₂e claim cannot be independently confirmed against monitoring data
- No VVB (Validation/Verification Body) identified in the extracted record, raising questions about who validated or verified the project
- Only two documents were used for extraction, one labelled 'unknown', and the minimum extraction confidence is rated low, meaning key data may have been missed or misread
- Project-specific baseline with no reassessment date stated for a project running since 2013
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test or VVB verification found
No buffer pool; no reversal events reported but not confirme
0% deemed negligible — plausible for energy but thin justifi
Project-specific baseline; no reassessment date stated
Safeguards and benefit sharing mentioned; no FPIC or grievan
CORSIA and CCP status both not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →