42 MW Biomass Based Power Generation at L.H. Sugar Factory Ltd. by Energy Advisory Services

UCR-317 ↗

#152of 196 in Biomass#216of 421 in Universal Carbon Registry (UCR)#34of 53 in ACM0006

3.3/ 10
Integrity
4.5
Transparency
1.5
Claim Safety
4.0
Documentation
2.5

Audit Analysis

This 42 MW biomass power project under the UCR registry relies on a single PDD document with no verification report, monitoring data, or identified verification body. While the jurisdictional baseline and established ACM0006 methodology provide a reasonable design foundation, the complete absence of verified emissions reductions, permanence safeguards, and independent verification makes it impossible to confirm the project's claimed 2.89 million tonnes of lifetime reductions.

Red Flags

  • No verification report or monitoring report found in the evidence base — only the PDD is available, leaving all claimed reductions unverified
  • No verification body (VVB) identified in any document, so additionality and compliance cannot be independently confirmed
  • No buffer pool or permanence mechanism documented for a project with an 18-year crediting period
  • Leakage deduction of 0% justified only as 'deemed negligible' with no quantitative analysis in the available record

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

PDD present but no VVB verification found

Permanence

No buffer pool; no reversal events stated

Leakage

0% deduction, 'deemed negligible' only

Baseline

Jurisdictional method; no reassessment date

Safeguards

Mentioned and benefit sharing described; no FPIC or grievanc

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19ACM0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents