3.7 MW Bundled Wind Power Project at Priyadarshini Polysacks Ltd. Dhulia District Maharashtra
#74of 770 in Renewable energy#40of 387 in India#12of 213 in CDM (UNFCCC)#24of 417 in AMS-I.D
Audit Analysis
A 3.7 MW CDM wind project in Maharashtra with VVB-confirmed additionality and a reasonable grid-emission-factor baseline, but hampered by a baseline-methodology contradiction between the validation report and later monitoring reports, a garbled VVB name, and missing verified-ERR and FNRB data. The project is inherently low-risk for permanence as an avoidance-type wind installation, and the 0% leakage deduction is defensible for this sector.
Red Flags
- Baseline method is recorded as 'project' in the 2021 monitoring report but 'jurisdictional' in the 2007 validation report — the VVB's jurisdictional classification is more appropriate for a grid-displacement wind project, and the later label shift is unexplained.
- The VVB name in the extracted record is garbled ('C/NCJ{?D C8 rcQ. 6/7"'), making independent verification of the verification body's identity and accreditation impossible from the available data.
- Total verified ERR is not stated in any extracted document; only the cumulative claimed figure of 17,968 tCO2e is available, preventing a direct claim-vs-verification cross-check.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 4,829 | 0 | 4,829 | |
| 2010 | 4,371 | 0 | 4,371 | |
| 2012 | 9,405 | 0 | 9,405 | |
| 2013 | 4,768 | 0 | 4,768 | |
| 2014 | 5,031 | 0 | 5,031 | |
| 2023 | 17,502 | 0 | 17,502 | |
| Total | 45,906 | 0 | 45,906 |
Risk Indicators
VVB-confirmed barrier test
Avoidance project, no reversal risk
0% deduction, quantified justification
Method label contradicts between docs
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →