4.5MW grid-connected Sugur Mini Hydel Scheme at SLS Power Industries Ltd in Bellary District, Karnataka
#90of 387 in India#28of 213 in CDM (UNFCCC)#46of 417 in AMS-I.D
Audit Analysis
A straightforward 4.5 MW grid-connected mini-hydro displacement project in Karnataka, India, validated under CDM AMS-I.D. v18.0 with a jurisdictional grid-emission-factor baseline. The project is low-risk in design (hydro displacing grid electricity, minimal leakage, no reversal risk), but the documentation record is thin — no monitoring report, no verification report, and a significant (7×) discrepancy between the PDD's initial CER estimate and the validated figure, explained by a revised grid emission factor. Overall a credible but modestly documented project with no major integrity concerns.
Red Flags
- The PDD (Feb 2022) estimated 68,481 CERs over the crediting period, but the validation report (Mar 2022) revised this to 9,783 — a ~7× reduction attributed to a change in the baseline grid emission factor (CAR #1). While the correction was caught during validation, the initial PDD figure was substantially overstated.
- No monitoring report or verification report appears in the extracted record; the monitoring period is not stated, making it impossible to confirm that any credits have actually been issued or verified post-validation.
- Leakage treatment is inconsistent across documents: the validation report (Mar 2022) states leakage is 'deemed negligible' (0% deduction), while an earlier appendix (Oct 2021) describes it as 'quantified.' The final position is 0% with a negligible justification, but the inconsistency weakens confidence in the leakage analysis.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 6,203 | 0 | 6,203 | |
| 2009 | 4,532 | 0 | 4,532 | |
| 2011 | 4,920 | 0 | 4,920 | |
| 2012 | 6,018 | 0 | 6,018 | |
| 2013 | 8,593 | 0 | 8,593 | |
| 2022 | 31,350 | 0 | 31,350 | |
| Total | 61,616 | 0 | 61,616 |
Risk Indicators
Combined test applied per AMS-I.D.
No buffer pool; low inherent risk but no explicit safeguard
0% deduction, negligible justification; minor doc inconsiste
Jurisdictional grid-EF baseline, reassessed 2022
Safeguards mentioned; FPIC and grievance mechanism not docum
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →