Skip to main content
GSWindPakistanACM0002

49.5 MW Sachal Wind Power Project, Jhampir

GS-609 ↗ · current registry ID: GS3511

#6of 770 in Renewable energy#2of 5 in Pakistan#2of 426 in Gold Standard (GS)#5of 383 in ACM0002

7.0/ 10
Integrity
7.0
Transparency
7.0
Claim Safety
7.5
Documentation
6.5

Audit Analysis

The Sachal Wind Power Project is a well-structured Gold Standard wind project with a VVB-confirmed investment additionality test, a jurisdictional baseline reassessed in 2023, and no reversal events. The project significantly over-delivers relative to its ex-ante estimate, and leakage is appropriately deemed negligible for a grid-connected wind installation. However, multiple corrective action requests related to safeguard monitoring and ER calculation errors, along with several unresolved documentation gaps (FNRB, CORSIA/CCP status, buffer pool), moderate the overall assessment.

Red Flags

  • Three outstanding corrective action requests (safeguard principles monitoring, FAR reference corrections, yearly parameter presentation) indicate recurring documentation quality issues across monitoring cycles
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
  • Crediting period dates conflict between the verification report (2017–2027) and the monitoring report (2022–2027), creating ambiguity about the applicable crediting window
  • FPIC was not conducted, and safeguard principles monitoring was flagged as missing in the initial monitoring report

Credit Vintages

IssuedRetiredAvailable
2017
58,844058,844
2018
79,729079,729
2019
146,41662,23784,179
2020
77,5332,43475,099
2021
75,6351,51274,123
2022
56,928856,920
2023
18,908018,908
Total513,99366,191447,802

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Wind project, no reversal risk

Leakage

Deemed negligible, appropriate for grid-connected wind

Baseline

Jurisdictional, reassessed 2023

Safeguards

Grievance mechanism present, FPIC not conducted, CARs on saf

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents