50.6 MW Wind Power Project in Gujarat by Powerica Limited
GS-2262 ↗ · current registry ID: GS7621
#29of 770 in Renewable energy#16of 387 in India#8of 426 in Gold Standard (GS)#23of 383 in ACM0002
Audit Analysis
A 50.6 MW wind power project in Gujarat with VVB-confirmed additionality and verified emissions reductions of 262,301 tCO2e over a two-year monitoring period. The project is inherently low-risk as an avoidance-type renewable energy project, but eight contradictions across documents—particularly on baseline method, FPIC status, and crediting period—introduce moderate uncertainty. Eligibility for CORSIA and CCP is not stated in any available document.
Red Flags
- Eight contradictions across documents, including baseline method (project vs jurisdictional), FPIC status (conducted vs not conducted), and crediting period (2-year vs 5-year), reducing confidence in the extracted record
- Leakage justification is inconsistent: the verification report does not address leakage while the monitoring report deems it negligible, with no explicit quantification in either
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
- FPIC contradiction: the 2025 validation report states FPIC was not conducted, while a 2020 stakeholder consultation document indicates it was—privileging the more recent validation report
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 132,445 | 0 | 132,445 | |
| 2024 | 129,856 | 0 | 129,856 | |
| Total | 262,301 | 0 | 262,301 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal events
0% deduction, justification inconsistent
Method contradicted across documents
Grievance present, FPIC contradicted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →